Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (5)
- CROSS Newsletter (4)
- CROSS Safety Report (16)
- News [sub-heading only] (1)
CROSS regions
Beam and block floors fire resistance
A report has been received about unsubstantiated claims of fire performance and the unavailability of test data for a specific form of construction.
13 December 2021
CROSS Safety Report
Report ID: 1072
Region: CROSS-UK
Concern over modelling of concrete frame building for construction stage
Independent check shows inadequate modelling of concrete frame building with transfer slab.
10 March 2022
CROSS Safety Report
Report ID: 1073
Region: CROSS-UK
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Inadequate modelling of existing building
An existing building suffered damage while being upgraded, which led to a more detailed inspection of the existing building’s condition. The report highlights the importance of conducting a thorough investigation and assessment of an existing building structure to ensure an understanding of how it will perform under the applied design loads, rather than relying on assumptions that may be unre...
30 March 2023
CROSS Safety Report
Report ID: 1082
Region: CROSS-AUS
Fire compartmentation detailing issues
Two reports have been received concerning fire compartmentation detailing issues; one on the incorrect installation of fire batts and the other on the incorrect use of intumescent material.
18 August 2021
CROSS Safety Report
Report ID: 1039
Region: CROSS-UK
Fire spread through balconies
This report highlights that the extensive use of combustible materials in the construction of balconies can result in fire spread over the external wall to an extent which is inadequate for building safety, even buildings less than 18m.
17 November 2022
CROSS Safety Report
Report ID: 1052
Region: CROSS-UK
Concerns about punching shear in a flat slab
This report concerns potential shear failures in flat slabs. This originates from inconsistent design and detailing of the shear reinforcement where a proprietary shear link system is assumed in the design but not followed in detailing.
13 December 2021
CROSS Safety Report
Report ID: 1050
Region: CROSS-UK
Unstable building due to modification work
A SCOTCROSS report relates to an old four storey building undergoing modifications.
1 February 2007
CROSS Safety Report
Report ID: 69
Region: CROSS-UK
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK
The application of rule-based guidance and potential alternative approaches
A reporter raised with CROSS a series of questions and opinions about the treatment of fire risk in buildings and rule based guidance requirements.
17 February 2023
CROSS Safety Report
Report ID: 1142
Region: CROSS-UK