Safety information search results
Filter your results
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (11)
- CROSS Newsletter (11)
- CROSS Safety Report (14)
- News [sub-heading only] (1)
CROSS regions
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Further example of incorrect finite element modelling
Concerns in respect of the sufficiency of finite element modelling of masonry walls as part of a reinforced concrete framed building.
20 February 2023
CROSS Safety Report
Report ID: 1145
Region: CROSS-UK
Application of wind load code BS EN 1991 - wind actions
A reporter's concern is about the application of the wind load code BS EN 1991-1-4: 2005 Eurocode 1: Actions on structures - Part 1-4.
1 October 2014
CROSS Safety Report
Report ID: 403
Region: CROSS-UK
Use of proprietary element beyond stated values
After the construction of a 6m high lighting frame, the contractor noticed that the frame was both twisting and deflecting excessively under wind loading.
1 April 2018
CROSS Safety Report
Report ID: 667
Region: CROSS-UK
Inadequate billets used in precast concrete connections
Whilst completing a third-party design appraisal, a correspondent found that solid steel billets intended to form the primary shear transfer mechanism between concrete beams and columns were insufficient for this purpose.
1 April 2019
CROSS Safety Report
Report ID: 705
Region: CROSS-UK
Dangerous glass infill panels on balustrade
A reporter has expressed their concern about the structural stability of cantilever glass infill panels between a steel post and handrail balustrade system at a high-level apartment block.
1 January 2019
CROSS Safety Report
Report ID: 741
Region: CROSS-UK
No responsibility for damaged footbridge
A reporter describes how they tried to raise concerns over a damaged footbridge but could not determine who ownership.
1 July 2018
CROSS Safety Report
Report ID: 723
Region: CROSS-UK
Tower crane foundation design error
Whilst carrying out an independent design check on a tower crane foundation design, a reporter discovered that the piles used on site did not have the required tension capacity.
1 July 2018
CROSS Safety Report
Report ID: 662
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Quality of design and construction of a major bridge structure
This report concerns the design and installation of the bridge bearing zones on a new prestressed precast concrete viaduct.
1 October 2018
CROSS Safety Report
Report ID: 781
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.