Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
- BIM (1)
- Computational design (4)
- Design: quality management (6)
- Design calculations (11)
- Design conceptualisation (8)
- Design detailing (10)
- Design drawings (3)
- Design loads (6)
- Design software (6)
- Dynamics (1)
- Fire safety design (3)
- Resilience (3)
- Robustness (3)
- Structural design (12)
- Sustainability (1)
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (13)
- CROSS Newsletter (6)
- CROSS Safety Report (29)
- News [sub-heading only] (6)
CROSS regions
Dangerous building work on domestic project
Temporary propping fails during works to a semi-detached property putting the whole building at risk of collapse.
10 March 2022
CROSS Safety Report
Report ID: 1062
Region: CROSS-UK
Understanding finite element analysis for pile caps
A reporter questions the validity of using two-dimensional finite element (2D FE) shells to model structural elements such as pile caps.
18 October 2023
CROSS Safety Report
Report ID: 1152
Region: CROSS-UK
Concerns over execution class categorisation of steel pedestrian bridge
A reporter is concerned in respect of the steelwork execution class, and quality management arrangements, applied to the construction of a public access pedestrian bridge.
21 November 2022
CROSS Safety Report
Report ID: 1149
Region: CROSS-UK
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Inadequate design for basement works
An inadequate structural design for alterations to a basement led to structural distress within a substantial five-storey townhouse.
21 November 2022
CROSS Safety Report
Report ID: 1132
Region: CROSS-UK
Connection fixity considerations for steel frame modelling
This report concerns the modelling of joints when using computer programs. In some cases, engineers are applying rotational releases to joints in models but subsequently designing the connections as rigid. This leaves a fundamental mismatch between analysis and design which may lead to unsafe structural connections argues a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1139
Region: CROSS-UK
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
Building control and the design of a free-standing wall
A reporter raises concerns over the design of a 2m high freestanding garden wall.
1 April 2011
CROSS Safety Report
Report ID: 163
Region: CROSS-UK
Incorrectly installed tension control bolts could have led to serious consequences
A reporter finds incorrectly installed system HRC preload bolt assemblies, better known as tension control bolts, during a site inspection of a new highway bridge over a railway. The incorrectly fitted bolts could have had major structural implications, and led to other safety risks, if the installation error had not been spotted.
24 May 2023
CROSS Safety Report
Report ID: 1196
Region: CROSS-UK
Poorly applied external insulation on buildings
This report concerns external insulation on buildings being inadequately applied and fixed, with poor control of the workmanship standards, leading to potential safety concerns and damage to the property.
21 August 2023
CROSS Safety Report
Report ID: 1203
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.