Safety information search results
Filter your results
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Theme pages
Content type
- CROSS-AUS Newsletter 5 (2)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (10)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (9)
- CROSS Safety Report (26)
- News [sub-heading only] (1)
CROSS regions
Piling platform failure
While back screwing an auger, the ground began to fail under the foot of the rig causing it to sink forwards and collapse.
1 January 2012
CROSS Safety Report
Report ID: 271
Region: CROSS-UK
Incorrectly installed tension control bolts could have led to serious consequences
A reporter finds incorrectly installed system HRC preload bolt assemblies, better known as tension control bolts, during a site inspection of a new highway bridge over a railway. The incorrectly fitted bolts could have had major structural implications, and led to other safety risks, if the installation error had not been spotted.
24 May 2023
CROSS Safety Report
Report ID: 1196
Region: CROSS-UK
Wrong length blind bolts lead to unsafe bridge structure
Bridge strengthening being carried out using blind bolts left a structure in an unsafe condition with traffic loading on it.
20 February 2023
CROSS Safety Report
Report ID: 1185
Region: CROSS-UK
Cantilever bridge parapet falsework failure
A reporter has experienced the failure of cantilever parapet falsework twice, for different reasons, using two different products during bridge construction.
20 February 2023
CROSS Safety Report
Report ID: 1159
Region: CROSS-UK
Missing rebar identified prior to concrete slab pour
A reporter describes how they often encounter issues such as missing reinforcement while carrying out pre-pour inspections.
1 January 2013
CROSS Safety Report
Report ID: 310
Region: CROSS-UK
Unauthorised alterations to Light Gauge Steel Framing on site
Concerns were raised after Light Gauge Steel Framing (LGSF) acting as a structural system was trimmed locally on site to accommodate the installation of balcony brackets without approval from the design team.
1 July 2018
CROSS Safety Report
Report ID: 669
Region: CROSS-UK
Remoteness of contact and lack of supervision
A correspondent has been thinking about the problem of lack of supervision in construction generally and has come to the conclusion that this is all part of a wider problem.
1 January 2019
CROSS Safety Report
Report ID: 684
Region: CROSS-UK
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Independence of Approved Inspectors
A reporter believes public awareness should be raised regarding the possibility that building control can be performed under a business to business commercial contract for the interest of someone other than property owners.
1 July 2015
CROSS Safety Report
Report ID: 507
Region: CROSS-UK
The role of District Surveyors
A reporter highlights how, under the London Building Acts 1930, District Surveyors were appointed to supervise construction and enforce regulations.
1 January 2018
CROSS Safety Report
Report ID: 713
Region: CROSS-UK