Safety information search results
Filter your results
Safety area
Building or structure type
Building height
Materials
Products
Project or lifecycle stage
Construction
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Galvanic (bimetallic) corrosion not considered in cladding design
A cladding designer and installer did not consider galvanic (bimetallic) corrosion which led to remedial works being required.
30 June 2022
CROSS Safety Report
Report ID: 811
Region: CROSS-UK
Corrosion of bridge girder beams
Severe corrosion of bridge girder beams was found during intrusive inspections.
23 May 2022
CROSS Safety Report
Report ID: 772
Region: CROSS-UK
Accelerated corrosion of telecoms mast holding down bolts
During an examination of a 20m high telecoms mast, a reporter found that there had been accelerated corrosion of the galvanised holding down bolts.
1 June 2022
CROSS Safety Report
Report ID: 773
Region: CROSS-UK
Corrosion of steel truss footbridge
Severe corrosion was found in a steel truss footbridge during a planned examination.
23 May 2022
CROSS Safety Report
Report ID: 774
Region: CROSS-UK
Contractor notches steel transfer beam
A transfer beam with 50mm thick flanges supporting a four-storey building was notched, without approval from the design engineer, to accommodate suspended ceiling fixings.
29 March 2021
CROSS Safety Report
Report ID: 829
Region: CROSS-UK
Incorrect fabrication of balustrade connection
A reporter describes how threaded bars were incorrectly used for a balustrade fixing instead of bolts which led to failure of the connection.
6 April 2023
CROSS Safety Report
Report ID: 851
Region: CROSS-UK
Overall stability of building proposed to be provided by metal framing and plasterboard
Metal framing and plasterboard was used to provide lateral stability to a building. The form of construction was later deemed to be unsuitable and extensive remedial works had to be carried out.
24 May 2023
CROSS Safety Report
Report ID: 468
Region: CROSS-UK
Fatigue failure of bridge cross-girder
During a planned examination of a bridge, a cross-girder was found to have failed via fatigue.
23 May 2022
CROSS Safety Report
Report ID: 743
Region: CROSS-UK
Corrosion of main girder beam on bridge supporting rail lines
A hole was found in the central main girder on a bridge supporting rail line during inspection works.
23 May 2022
CROSS Safety Report
Report ID: 745
Region: CROSS-UK