Safety information search results
Filter your results
Safety area
Building height
Materials
Products
Project or lifecycle stage
Design
Construction
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Volumetric modular buildings and fire
A report has been received concerning volumetric modular construction, in the form of permanent stacked modular buildings. The reporter is concerned that the existence of extensive cavities within the compartments, combined with the lack of appropriate care when connecting the modules could lead to the concealed spread of fire and smoke, noting some recent fire events.
16 December 2021
CROSS Safety Report
Report ID: 1065
Region: CROSS-UK
Fire protection to structure by cavity barriers
A reporter is concerned about a potential misconception in the construction industry regarding the role of cavity barriers and the impact their design and installation can have on the structural performance of a building.
20 November 2023
CROSS Safety Report
Report ID: 1231
Region: CROSS-UK
Intumescent paint application
A report has been received regarding issues of detailing by following the relevant advice provided from an intumescent paint supplier.
6 June 2022
CROSS Safety Report
Report ID: 1113
Region: CROSS-UK
Design criteria for firefighting lifts
A reporter is of the opinion that the design criteria for firefighting lifts should be re-evaluated.
24 May 2023
CROSS Safety Report
Report ID: 1182
Region: CROSS-UK
The potential impact of scaffolding on fire safety
An issue has been raised with CROSS regarding the risk assessment process when scaffolding is present around an in-use building. It is considered that combustible scaffolding elements can potentially facilitate external fire spread, and additionally impact the performance of some of the building’s fire safety measures.
17 February 2023
CROSS Safety Report
Report ID: 1153
Region: CROSS-UK
Junction of partitioning walls and ceilings
A potential issue has been raised with CROSS, regarding the order of works in partitioning assemblies and how these can affect the performance of compartmentation.
17 February 2023
CROSS Safety Report
Report ID: 1156
Region: CROSS-UK
Fire involving fluorescent light fitting
A fire involving a fluorescent light fitting occurred in a corridor in a sheltered housing complex.
21 August 2023
CROSS Safety Report
Report ID: 1157
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.