Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (1)
- Assessment project [sub-heading only] (2)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (4)
- Excavation (1)
- Groundworks project (1)
- New build (1)
- Refurbishment (1)
- Remediation project (2)
- Repair project (1)
- Structural assessment (4)
Method of construction
Structural form
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
CROSS regions
Vegetation damage to railway arches
Lack of clarity as to maintenance responsibilities leads to degradation of railway arches.
6 June 2022
CROSS Safety Report
Report ID: 1064
Region: CROSS-UK
Water ingress to cross-laminated timber structural frame
In an eight year old building that included cross-laminated timber construction, it was found that water penetration had caused parts of the structure to rot.
6 June 2022
CROSS Safety Report
Report ID: 1124
Region: CROSS-UK
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Concerns over corrosion of dissimilar metals in fixing cavity wall tie systems
A reporter is concerned about corrosion that may occur between dissimilar metals that can be used in cavity wall tie systems. The reporter has noted that stainless steel and carbon steel may be fixed together in wall cavities, which are damp environments, and that corrosion of dissimilar metals in contact may occur.
24 May 2023
CROSS Safety Report
Report ID: 1186
Region: CROSS-UK
Collapse of folded plate timber roof at a school
This report is about a critical safety issue concerning folded timber roofs, in various settings, including over school halls.
18 October 2023
CROSS Safety Report
Report ID: 1160
Region: CROSS-UK
Failure of cantilevered stone staircase
During the renovation and change-of-use conversion of a former minor stately home built around 1830, under pedestrian loading, a ‘cantilevered’ stone staircase partially collapsed without warning.
21 February 2023
CROSS Safety Report
Report ID: 1147
Region: CROSS-UK
RAAC planks in a 1970s shopping centre
An existing large shopping centre built circa 1975 had a number of external storerooms and loading bays with roofs constructed using reinforced autoclaved aerated concrete (RAAC) planks. The planks had deflected to the extent that they needed replacing.
20 February 2023
CROSS Safety Report
Report ID: 1155
Region: CROSS-UK
Corrosion concerns on a pedestrian bridge
A reporter is concerned about a pedestrian bridge that may have reduced load capacity due to corrosion at the root of cantilever supports.
17 February 2023
CROSS Safety Report
Report ID: 1161
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.