Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (12)
- CROSS Newsletter (8)
- CROSS Safety Report (15)
- News [sub-heading only] (3)
CROSS regions
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Unstable building due to modification work
A SCOTCROSS report relates to an old four storey building undergoing modifications.
1 February 2007
CROSS Safety Report
Report ID: 69
Region: CROSS-UK
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK
Mobile scaffold tower falls 7 storeys
A mobile tower, which was not being used, toppled over the guardrail and fell 7 storeys (27m) to the ground.
1 April 2014
CROSS Safety Report
Report ID: 436
Region: CROSS-UK
Columns missing due to 3D modelling
A new eight storey residential concrete frame building was being constructed and several columns were omitted from the ground and first floor level drawings, says a reporter.
1 January 2017
CROSS Safety Report
Report ID: 614
Region: CROSS-UK
Parapet wall collapse
The sudden failure of parapet coping stones on an old two storey industrial building caused the stones to fall onto a road and pavement below.
1 January 2018
CROSS Safety Report
Report ID: 711
Region: CROSS-UK
Dangerous modification during construction of five storey block of flats
A reporter was asked to investigate a five storey timber framed block of flats after the leaseholder of the top floor reported gaps appearing between oak floorboards.
1 January 2018
CROSS Safety Report
Report ID: 699
Region: CROSS-UK
Padstones out of position leads to collapse
This report concerns the partial collapse of a terrace of four storey houses during construction due to padstones being placed incorrectly.
1 April 2017
CROSS Safety Report
Report ID: 602
Region: CROSS-UK
Steel canopy collapse during building completion works
During the construction of a new school, a long span steel truss failed, resulting in the collapse of a canopy.
1 July 2017
CROSS Safety Report
Report ID: 664
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Submit a report