Safety information search results
Filter your results
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (2)
- Construction project [sub-heading only] (16)
- Extension project (4)
- Fire safety assessment (1)
- Maintenance project (1)
- New build (9)
- Refurbishment (2)
- Remediation project (4)
- Strengthening project (1)
- Structural assessment (1)
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (3)
- CROSS-UK Newsletter 65 (4)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (5)
- CROSS-UK [sub-heading only] (17)
- CROSS Newsletter (16)
- CROSS Safety Report (64)
- News [sub-heading only] (4)
CROSS regions
Balcony collapse at block of flats
An in-situ reinforced concrete balcony collapsed at a block of flats which are believed to have been built in the 1960s.
1 January 2014
CROSS Safety Report
Report ID: 341
Region: CROSS-UK
Balcony construction defects of residential flats
A reporter's firm have been undertaking structural assessments of cantilevered reinforced concrete walkways, which in the majority of cases have been found to be under strength.
1 April 2014
CROSS Safety Report
Report ID: 435
Region: CROSS-UK
Metal cladding panels blowing in the wind
A local authority was called to investigate a dangerous structure where metal cladding panels on the 10th floor of a student accommodation block were flapping in high winds.
1 January 2015
CROSS Safety Report
Report ID: 461
Region: CROSS-UK
Cantilevered brickwork - fatal collapse during construction
A blade of 270mm cavity brickwork in a temporary condition fell and killed a bricklayer after sixteen scaffold planks were leant against the wall on the side remote from the bricklayer.
1 April 2015
CROSS Safety Report
Report ID: 476
Region: CROSS-UK
Failure of beams in listed building
Conversion and refurbishment work on a listed building led to structural failures of beams and subsequent difficulties in resolving safety matters between the various agencies involved.
30 July 2021
CROSS Safety Report
Report ID: 1016
Region: CROSS-UK
Fire protection of light gauge steel frames
A reporter is concerned that there is a lack of understanding regarding system testing and associated procedures, the purpose of fire assessments, and the role of materials that contribute to the structure’s fire protection.
10 December 2021
CROSS Safety Report
Report ID: 1030
Region: CROSS-UK
Fire in roofs containing PV panels
A reporter is concerned about the monitoring of photovoltaic panels and whether all the possible lessons are learned from current experience.
26 August 2022
CROSS Safety Report
Report ID: 1032
Region: CROSS-UK
The risk of collapse of multi-storey CLT buildings during a fire
A reporter presents concerns about the fire safety of multi-storey buildings comprised of cross-laminated timber (CLT) structures.
29 March 2021
CROSS Safety Report
Report ID: 966
Region: CROSS-UK
Volumetric modular buildings and fire
A report has been received concerning volumetric modular construction, in the form of permanent stacked modular buildings. The reporter is concerned that the existence of extensive cavities within the compartments, combined with the lack of appropriate care when connecting the modules could lead to the concealed spread of fire and smoke, noting some recent fire events.
16 December 2021
CROSS Safety Report
Report ID: 1065
Region: CROSS-UK
Concern over modelling of concrete frame building for construction stage
Independent check shows inadequate modelling of concrete frame building with transfer slab.
10 March 2022
CROSS Safety Report
Report ID: 1073
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.