Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (3)
- (-) CROSS-UK [sub-heading only] (10)
- CROSS Newsletter (3)
- CROSS Safety Report (10)
- News [sub-heading only] (4)
CROSS regions
School roof timber truss collapse
A gym/assembly hall roof to a school collapsed suddenly and without warning overnight when fortunately the building was unoccupied.
1 January 2012
CROSS Safety Report
Report ID: 249
Region: CROSS-UK
Do current regulations apply when repairing older buildings?
A 19th century three story mill was subject to a fire which resulted in the sudden collapse of part of the interior structure.
1 October 2010
CROSS Safety Report
Report ID: 212
Region: CROSS-UK
Progressive collapse of an old mill building during a fire
An old mill building that was constructed around 1830 collapsed unexpectedly in a fire.
1 October 2008
CROSS Safety Report
Report ID: 122
Region: CROSS-UK
Padstones out of position leads to collapse
This report concerns the partial collapse of a terrace of four storey houses during construction due to padstones being placed incorrectly.
1 April 2017
CROSS Safety Report
Report ID: 602
Region: CROSS-UK
Timber roof truss bracing problem
Lateral movement of the roof tiles on a two-storey mid-terrace house built approximately 35 years ago with a trussed rafter roof led to the discovery of broken bracing.
1 July 2014
CROSS Safety Report
Report ID: 354
Region: CROSS-UK
Lack of method statements on domestic projects
A reporter has observed that where an opening is being formed on domestic properties for, say a rear extension, that the builders tend to remove the masonry and follow up with the temporary propping.
1 January 2019
CROSS Safety Report
Report ID: 757
Region: CROSS-UK
Wall tie design between masonry panels and timber frames
This report discusses the potential for failure of timber frame wall ties between masonry and timber in moderate to high wind conditions.
1 January 2020
CROSS Safety Report
Report ID: 832
Region: CROSS-UK
Propping of post-tensioned slabs during construction
A reporter raises their concerns after an infill slab strip was not poured in time which resulted in overloading of the slab below during a concrete pour.
1 April 2020
CROSS Safety Report
Report ID: 873
Region: CROSS-UK
Post-tensioned slab failure during tendon stressing operations
A reporter disseminates the lessons learned after the end of a slab burst while stressing the tendons in a post-tensioned concrete slab.
1 April 2020
CROSS Safety Report
Report ID: 882
Region: CROSS-UK
Dangerous substitution of lintels on domestic projects
This report highlights the structural risk of substituting lintels during domestic projects without approval from the design engineer.
1 April 2020
CROSS Safety Report
Report ID: 889
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.