Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (5)
- CROSS Newsletter (3)
- CROSS Safety Report (14)
- News [sub-heading only] (1)
CROSS regions
Questionable temporary works used to retain embankment excavation
This report is about the need for properly engineered retaining walls for all heights of retained materials.
1 June 2022
CROSS Safety Report
Report ID: 806
Region: CROSS-UK
Potentially unsafe buckling resistance checks using software
A number of anomalies were detected in the outputs from a proprietary structural steelwork design program.
6 June 2022
CROSS Safety Report
Report ID: 1075
Region: CROSS-UK
Dangerous design of a retaining wall
Serious errors were made in the input to a computer program used for designing a 1.8m high retaining wall.
29 March 2021
CROSS Safety Report
Report ID: 989
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Collapse of blockwork retaining wall
An 18m length of a 29m long by 140mm thick 2m high dense concrete block retaining wall collapsed hours after being backfilled.
1 October 2009
CROSS Safety Report
Report ID: 162
Region: CROSS-UK
Concerns with propping design to large excavations
Concerns are raised about the design of propping to large excavations and particularly about the design of the connections for a raking prop to a horizontal waler.
1 January 2019
CROSS Safety Report
Report ID: 298
Region: CROSS-UK
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Retaining wall collapse
A retaining wall is reported to have collapsed four times during the course of its life.
1 April 2007
CROSS Safety Report
Report ID: 76
Region: CROSS-UK
Deadly retaining wall
A blockwork retaining wall, about 2.5 metres high suddenly collapsed causing a fatality.
1 July 2009
CROSS Safety Report
Report ID: 134
Region: CROSS-UK
Retaining wall concerns and the stance of a local authority
A reporter was asked by a client to assess a retaining wall built on their boundary by a neighbour who had erected a new dwelling. A review of the calculations and a typical section gave serious concern for its strength.
1 July 2010
CROSS Safety Report
Report ID: 189
Region: CROSS-UK