Safety information search results
Filter your results
Building or structure type
Building height
Materials
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Remoteness of contact and lack of supervision
A correspondent has been thinking about the problem of lack of supervision in construction generally and has come to the conclusion that this is all part of a wider problem.
1 January 2019
CROSS Safety Report
Report ID: 684
Region: CROSS-UK
Deflection of bridge girder under load
A report was received from a bridge examiner to say outer main girder of a short span railway bridge was moving up to 30mm under load.
1 July 2016
CROSS Safety Report
Report ID: 557
Region: CROSS-UK
Incomplete casting of composite brick/concrete parapets
A reporter states that during a parapet raising scheme over a mainline railway, a void up to 300mm deep was identified below existing coping bed level.
1 January 2018
CROSS Safety Report
Report ID: 635
Region: CROSS-UK
Settlement of driven piles
A railway platform was constructed on piled foundations and it was noticed that one pair of piles and their associated cross head settled soon afterwards.
1 April 2017
CROSS Safety Report
Report ID: 607
Region: CROSS-UK
Viaduct survey concerns
A reporter raises concerns about a small four span brickwork railway viaduct that has been degrading for some time.
1 January 2014
CROSS Safety Report
Report ID: 346
Region: CROSS-UK