Safety information search results
Filter your results
Building or structure type
- Bridges (20)
- Buildings
(101)
- Car parks (9)
- Commercial (6)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (3)
- Health care (1)
- Higher-risk buildings (1)
- Industrial buildings (2)
- Laboratory buildings (1)
- LPS buildings (4)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (1)
- Recreational buildings (2)
- Residential (25)
- Stadiums (1)
- Storage buildings (3)
- Tall buildings (5)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Buried pipes & culverts (2)
- Masts & towers (3)
- Railways (6)
- Retaining structures (11)
- Roads (5)
- Sewers (2)
- Temporary structures (4)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (8)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (84)
- Demolition project (8)
- Excavation (1)
- Extension project (3)
- Fire safety assessment (1)
- Groundworks project (1)
- New build (61)
- Refurbishment (4)
- Remediation project (6)
- Repair project (3)
- Strengthening project (4)
- Structural assessment (10)
- Underpinning project (1)
Construction period
Elements & systems
- Balconies (4)
- Balustrades (1)
- Basements (4)
- Beams (31)
- Bracing (4)
- Canopies (1)
- Ceilings (3)
- Cladding (2)
- Columns (24)
- Fasteners & connections (31)
- Fire protection (3)
- Foundations (16)
- Insulation (2)
- Light gauge steel framing (1)
- Lintels (1)
- Padstones (2)
- Parapets (6)
- Roofs (10)
- Shear walls (1)
- Signs (2)
- Slabs (50)
- Tendons (1)
- Wall head restraints (1)
- Walls (30)
- Wall ties (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 4 (5)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (9)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (3)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (4)
- CROSS-UK Newsletter 19 (3)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (4)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 30 (4)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (3)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (3)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (4)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (90)
- CROSS-US Newsletter 2 (1)
- CROSS-US Newsletter 3 (2)
- CROSS Newsletter (57)
- CROSS Safety Alert (3)
- CROSS Safety Report (165)
- CROSS Theme Page (1)
- News [sub-heading only] (13)
- Third party article (1)
- Third party content (1)
CROSS regions
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Structural corrosion in a swimming pool building causes concern
A survey showed severe corrosion of previously repaired steelwork columns adjacent to a public swimming pool.
30 July 2021
CROSS Safety Report
Report ID: 1004
Region: CROSS-UK
The use of cast-in ferrules as structural connections
This report highlights several problems that can arise with structural connections between elements when cast-in ferrules (also known as threaded inserts) are used for the anchorage of reinforcing bars.
30 April 2021
CROSS Safety Report
Report ID: 993
Region: CROSS-AUS
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Waterproofing exposed concrete slabs
This report highlights that water ingress into buildings continues to be a problem and discusses the role of the structural engineer when dealing with waterproofing of exposed concrete slabs. It shows how this can be achieved by careful design and detailing of the reinforced concrete structure and by close collaboration of all parties involved.
25 November 2021
CROSS Safety Report
Report ID: 959
Region: CROSS-AUS
Channel slab roof deck collapse during reroofing
This report highlights the structural risk caused by machinery during reroof a project.
10 May 2021
CROSS Safety Report
Report ID: 970
Region: CROSS-US
Punching shear in concrete slabs at perimeter columns
A reporter raises concerns about the underestimation of bending moments in perimeter columns when assessing punching shear in adjacent concrete slabs. Punching shear failures can be brittle and catastrophic. Designers need to include the appropriate ultimate moment in the design actions.
14 October 2022
CROSS Safety Report
Report ID: 1122
Region: CROSS-AUS
Reinforced aerated autoclaved concrete planks found on pitched roof of 1990s hospital building
A building constructed in the early 1990s has been found to contain reinforced aerated autoclaved concrete (RAAC) planks. This date is important since it is much later than the previously thought last significant use of RAAC in buildings in the UK and potentially affects the scope of buildings that could require screening for RAAC problems.
26 August 2022
CROSS Safety Report
Report ID: 1125
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Collapse of tank falsework
This report relates to the collapse of falsework erected to construct an in situ, reinforced concrete, circular water retaining structure.
1 October 2009
CROSS Safety Report
Report ID: 150
Region: CROSS-UK