Safety information search results
Filter your results
Building or structure type
- Bridges (15)
- Buildings
(129)
- Agricultural buildings (5)
- Car parks (7)
- Commercial (10)
- Education, science & art buildings (14)
- Health care (2)
- Industrial buildings (7)
- LPS buildings (2)
- Public, religious & civic buildings (5)
- Recreational buildings (4)
- Residential (22)
- Storage buildings (5)
- Tall buildings (3)
- Theatres & other entertainment buildings (6)
- Transport buildings (4)
- Buried pipes & culverts (3)
- Freestanding walls (2)
- Masts & towers (7)
- Offshore structures (1)
- Railways (3)
- Retaining structures (15)
- Roads (7)
- Sewers (3)
- Temporary structures (16)
- Tunnels (2)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (8)
- Assessment project [sub-heading only] (2)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (71)
- Demolition project (9)
- Excavation (9)
- New build (25)
- Refurbishment (5)
- Remediation project (9)
- Repair project (6)
- Strengthening project (1)
- Structural assessment (4)
- Underpinning project (1)
Method of construction
Elements & systems
- Arch (3)
- Balconies (4)
- Balustrades (6)
- Basements (1)
- Beams (19)
- Bracing (6)
- Canopies (5)
- Ceilings (19)
- Cladding (14)
- Columns (7)
- Fasteners & connections (69)
- Fire protection (1)
- Foundations (8)
- Insulation (4)
- Lintels (2)
- Padstones (2)
- Parapets (5)
- Roofs (29)
- Sandwich panels (1)
- Signs (3)
- Slabs (22)
- Tendons (1)
- Trusses (3)
- Wall head restraints (1)
- Walls (40)
- Wall ties (4)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-UK Newsletter 1 (8)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (4)
- CROSS-UK Newsletter 8 (3)
- CROSS-UK Newsletter 9 (5)
- CROSS-UK Newsletter 10 (6)
- CROSS-UK Newsletter 11 (4)
- CROSS-UK Newsletter 12 (5)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (4)
- CROSS-UK Newsletter 18 (4)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 20 (4)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 23 (7)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 31 (4)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 33 (4)
- CROSS-UK Newsletter 34 (5)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (4)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (6)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (3)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (4)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (5)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (169)
- CROSS Newsletter (81)
- CROSS Safety Report (222)
- News [sub-heading only] (30)
- Safety information from CROSS [sub-heading only] (2)
- Safety information [sub-heading only] (1)
CROSS regions
Cladding fixed to stainless steel
Cladding panels fixed to a stainless steel supporting angle with stainless steel screws failed.
1 November 2005
CROSS Safety Report
Report ID: 7
Region: CROSS-UK
Roof overloading
A flat roof with parapets and internal downpipes collapsed after drainage outlets became blocked.
1 November 2005
CROSS Safety Report
Report ID: 9
Region: CROSS-UK
Items falling from buildings and structures
A reporter raises concerns about incidents on structures where items have fallen off.
1 November 2005
CROSS Safety Report
Report ID: 8
Region: CROSS-UK
Liquid metal assisted cracking (LMAC)
A reporter raises concerns about the risk of liquid metal assisted cracking during the hot dip galvanising process.
1 November 2006
CROSS Safety Report
Report ID: 45
Region: CROSS-UK
Responsibility for change
The inadequate substitution of lintels led to them buckling, and the surrounding masonry cracking.
1 February 2007
CROSS Safety Report
Report ID: 50
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Unstable building due to modification work
A SCOTCROSS report relates to an old four storey building undergoing modifications.
1 February 2007
CROSS Safety Report
Report ID: 69
Region: CROSS-UK
Liquid metal assisted cracking
Large cracks appeared down the sides of gusset welds after a truss was erected on site.
1 November 2006
CROSS Safety Report
Report ID: 49
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Rendered ceiling failure
This report relates to a failure of a false ceiling below a precast concrete floor.
1 January 2010
CROSS Safety Report
Report ID: 149
Region: CROSS-UK