Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 29 (3)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (4)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (39)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (36)
- CROSS Safety Alert (1)
- CROSS Safety Report (59)
- News [sub-heading only] (7)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Excessive deflection of spliced steel beam
A long-span primary steel beam deflects excessively at its splice during concreting of the floor slab.
30 August 2022
CROSS Safety Report
Report ID: 1111
Region: CROSS-UK
Stadia crash barriers
Some hollow steel posts forming part of a crash barrier, which were only 4-5 years old, had filled with water that had caused the damage on freezing in winter.
1 February 2001
CROSS Safety Alert
Region: CROSS-UK
Incompetent design of simple steel beams
This report concerns designs for simple steel beams submitted to building control bodies under Part A of the Building Regulations. The reporter, a checking engineer for a building control body, was not able to accept the effective length and restraints assumed in a number of submitted designs. Most originated from individuals who used proprietary structural design computer packages without, i...
24 May 2023
CROSS Safety Report
Report ID: 1183
Region: CROSS-UK
Specification issue with steel hollow sections
A reporter raises concerns after their structural engineer had failed to specify the steel grade used in the design for hollow sections on two projects.
30 July 2021
CROSS Safety Report
Report ID: 1006
Region: CROSS-UK
Roof collapse of warehouse structure under rainwater ponding
This report highlights the structural risk caused by rainwater ponding on relatively flat roofs.
10 May 2021
CROSS Safety Report
Report ID: 969
Region: CROSS-US
False CE certificates
This report is about falsified documents in circulation within the EU purporting to be CE certificates.
1 January 2013
CROSS Safety Report
Report ID: 284
Region: CROSS-UK
Freezing splits galvanised SHS columns
Concerns were raised after several square hollow section members split vertically on a partially complete construction site.
1 April 2012
CROSS Safety Report
Report ID: 253
Region: CROSS-UK
Steel connector failures and forged certificates
According to a reporter, some suppliers are receiving components that are accompanied by certificates that are potentially false or forged.
1 July 2012
CROSS Safety Report
Report ID: 254
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.