Safety information search results
Filter your results
Building or structure type
- Bridges (3)
- Buildings
(35)
- Car parks (2)
- Commercial (2)
- Education, science & art buildings (3)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (1)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (3)
- Residential (12)
- Stadiums (1)
- Tall buildings (3)
- Theatres & other entertainment buildings (2)
- Transport buildings (2)
- Floating structures (1)
- Freestanding walls (1)
- Marine structures (1)
- Masts & towers (2)
- Railways (1)
- Retaining structures (3)
- Temporary structures (2)
Materials
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Construction period
Method of construction
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 5 (2)
- CROSS-UK Newsletter 61 (3)
- CROSS-UK Newsletter 62 (7)
- CROSS-UK Newsletter 64 (4)
- CROSS-UK Newsletter 65 (4)
- CROSS-UK Newsletter 68 (1)
- CROSS Feature Article (1)
- CROSS Newsletter (9)
- CROSS Safety Alert (1)
- CROSS Safety Report (46)
- Third party content (2)
- Third party content (2)
CROSS regions
Overall stability of building proposed to be provided by metal framing and plasterboard
Metal framing and plasterboard was used to provide lateral stability to a building. The form of construction was later deemed to be unsuitable and extensive remedial works had to be carried out.
24 May 2023
CROSS Safety Report
Report ID: 468
Region: CROSS-UK
Fatigue failure of bridge cross-girder
During a planned examination of a bridge, a cross-girder was found to have failed via fatigue.
23 May 2022
CROSS Safety Report
Report ID: 743
Region: CROSS-UK
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
Mesh flooring safety issues
A reporter has recently witnessed a number of safety issues with open grid mesh flooring.
10 February 2023
CROSS Safety Report
Report ID: 913
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
The risk of collapse of multi-storey CLT buildings during a fire
A reporter presents concerns about the fire safety of multi-storey buildings comprised of cross-laminated timber (CLT) structures.
29 March 2021
CROSS Safety Report
Report ID: 966
Region: CROSS-UK
Waterproofing exposed concrete slabs
This report highlights that water ingress into buildings continues to be a problem and discusses the role of the structural engineer when dealing with waterproofing of exposed concrete slabs. It shows how this can be achieved by careful design and detailing of the reinforced concrete structure and by close collaboration of all parties involved.
25 November 2021
CROSS Safety Report
Report ID: 959
Region: CROSS-AUS
Contractor notches steel transfer beam
A transfer beam with 50mm thick flanges supporting a four-storey building was notched, without approval from the design engineer, to accommodate suspended ceiling fixings.
29 March 2021
CROSS Safety Report
Report ID: 829
Region: CROSS-UK
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.