Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
CROSS regions
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Critical welding of structural steelwork missed
The designer of a steelwork roof frame found a critical fabrication error when inspecting steelwork on site before it was erected.
21 November 2022
CROSS Safety Report
Report ID: 1126
Region: CROSS-UK
Cladding failure in strong winds
A reporter writes with concerns about a repeat failure of building cladding, in severe but not exceptional winds, that saw panels fall to the public street below.
17 February 2023
CROSS Safety Report
Report ID: 1172
Region: CROSS-UK
Incorrectly fixed sheets blow off parapet
This report concerns aluminium coping sheets that blew off the parapet of a block of flats under construction. The reporter says a fierce wind blew off several sheets which fell to the ground about 9m below. A building and a car were damaged but thankfully no one was hurt, although the potential for personal injury or death was significant.
25 May 2023
CROSS Safety Report
Report ID: 1180
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Mandatory seismic retrofit construction with quality control problems
Standard seismic retrofit details were used for a building with a non-standard foundation, resulting in inadequate connection of structural shear walls to foundations.
1 September 2020
CROSS Safety Report
Report ID: 888
Region: CROSS-US
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK
Failure of existing long-span wood roof truss following installation of new roof-top HVAC units
Failure of an existing long-span wood roof truss following installation of new roof-top Heating, Ventilating, and Air Conditioning (HVAC) units offers lessons in the special challenges of renovations to existing buildings.
1 September 2020
CROSS Safety Report
Report ID: 949
Region: CROSS-US
Inadequate design and quality assurance on a mandatory seismic retrofit project
A tenant's structural engineer discovers widespread design and related quality problems on a mandatory seismic retrofit project.
1 September 2020
CROSS Safety Report
Report ID: 986
Region: CROSS-US
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.