Safety information search results
Filter your results
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (11)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (8)
- CROSS Safety Report (15)
- News [sub-heading only] (2)
CROSS regions
Roof collapse of warehouse structure under rainwater ponding
This report highlights the structural risk caused by rainwater ponding on relatively flat roofs.
10 May 2021
CROSS Safety Report
Report ID: 969
Region: CROSS-US
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Inadequate foundation reinforcement
Subcontractors carrying out the ground works for a multi-storey development failed to provide sufficient continuity reinforcement in the ground beams.
1 October 2008
CROSS Safety Report
Report ID: 112
Region: CROSS-UK
Stability compromised in school hall
A reporter highlights construction issues that occurred during the construction of a new school hall.
1 January 2012
CROSS Safety Report
Report ID: 242
Region: CROSS-UK
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK
Split responsibilities on temporary bracing of steelwork
A contractor removed temporary bracing on site prior to the structure being in a permanent stable state.
1 July 2010
CROSS Safety Report
Report ID: 204
Region: CROSS-UK
Issues with imported steel
Defective steel, says a reporter, was found in a major retail store where the material had been imported from a supplier overseas.
1 October 2014
CROSS Safety Report
Report ID: 474
Region: CROSS-UK
Failure of precast concrete cover slab to circular shaft
A reporter describes how several precast concrete cover slab units collapsed shortly after being installed.
1 April 2015
CROSS Safety Report
Report ID: 505
Region: CROSS-UK
Dangerous substitution of lintels on domestic projects
This report highlights the structural risk of substituting lintels during domestic projects without approval from the design engineer.
1 April 2020
CROSS Safety Report
Report ID: 889
Region: CROSS-UK
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.