Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
CROSS regions
Concern about rebending starter bars
This report concerns the bending and rebending of starter bars on site during the construction of a multi storey tower. The reporter considered that such a practice could compromise the structure under extreme load conditions.
24 May 2023
CROSS Safety Report
Report ID: 1164
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Temporary instability of columns
Concerns were raised by a reporter on the temporary stability of concrete columns during construction.
2 February 2023
CROSS Safety Report
Report ID: 872
Region: CROSS-UK
Missing starter bars
During an inspection the reporter observed that all the continuity starter bars projecting from the wall kicker were in fact loose.
1 July 2007
CROSS Safety Report
Report ID: 37
Region: CROSS-UK
Further demolition collapse
This report is of an incident that occurred recently in a UK city when a floor suffered a structural collapse during the demolition of a reinforced concrete building.
1 January 2008
CROSS Safety Report
Report ID: 90
Region: CROSS-UK
Pre-stressing ducts
A reporter has come across a situation where during grouting of the ducts in a slab, patches of concrete as big as 0.5m x 1m and 30mm thick fell on to the ground creating a safety hazard.
1 October 2008
CROSS Safety Report
Report ID: 89
Region: CROSS-UK
Car park staircase collapse at construction joint
The top flight of a staircase to a multi-storey concrete car park collapsed approximately 10 years after construction.
1 July 2008
CROSS Safety Report
Report ID: 106
Region: CROSS-UK
Balcony collapse at block of flats
An in-situ reinforced concrete balcony collapsed at a block of flats which are believed to have been built in the 1960s.
1 January 2014
CROSS Safety Report
Report ID: 341
Region: CROSS-UK
Retaining wall excavation collapse
A 6m deep excavation formed for constructing a retaining wall on a domestic project collapsed due to insufficient propping.
1 July 2019
CROSS Safety Report
Report ID: 800
Region: CROSS-UK
Balcony construction defects of residential flats
A reporter's firm have been undertaking structural assessments of cantilevered reinforced concrete walkways, which in the majority of cases have been found to be under strength.
1 April 2014
CROSS Safety Report
Report ID: 435
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.