Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (18)
- (-) CROSS Newsletter (20)
- CROSS Safety Report (20)
- News [sub-heading only] (2)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Delay by party wall surveyor adds to risk
A party wall surveyor causes delay which prevents a dangerous wall from being made safe in a timely manner.
10 March 2022
CROSS Safety Report
Report ID: 1010
Region: CROSS-UK
Wall collapse from building in city centre - who is responsible?
A 4-4.5m high wall, approximately 18m long, and nearly 40t of bricks collapsed into a road crushing three empty vehicles.
1 January 2013
CROSS Safety Report
Report ID: 306
Region: CROSS-UK
Brick wall removed to leave precast panels unsupported
Precast concrete slabs were left unsupported after a supporting brick wall was removed during demolition works.
1 July 2014
CROSS Safety Report
Report ID: 384
Region: CROSS-UK
Cantilevered brickwork - fatal collapse during construction
A blade of 270mm cavity brickwork in a temporary condition fell and killed a bricklayer after sixteen scaffold planks were leant against the wall on the side remote from the bricklayer.
1 April 2015
CROSS Safety Report
Report ID: 476
Region: CROSS-UK
Fatal wall collapse at school due to wall climbing
This report has been provided by the Health and Safety Executive (HSE) and once again highlights the potential dangers of freestanding masonry walls.
1 July 2018
CROSS Safety Report
Report ID: 447
Region: CROSS-UK
Stability of terraced buildings
A reporter is concerned about a terrace of four buildings the third of which is being opened up.
1 April 2015
CROSS Safety Report
Report ID: 448
Region: CROSS-UK
Unbraced temporary props
An alarming photograph has been sent by a contributor.
1 January 2015
CROSS Safety Report
Report ID: 482
Region: CROSS-UK
Safety concerns with twin wall system
A reporter raises safety concerns over the temporary stability of twin wall systems after they observed failures during construction.
1 April 2014
CROSS Safety Report
Report ID: 402
Region: CROSS-UK
High strength concrete incident
Confusion on sites lead to the incorrect concrete grade being used for some structural elements.
1 April 2014
CROSS Safety Report
Report ID: 406
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.