Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (5)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (22)
- (-) CROSS Newsletter (30)
- CROSS Safety Report (30)
- News [sub-heading only] (6)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Contractor notches steel transfer beam
A transfer beam with 50mm thick flanges supporting a four-storey building was notched, without approval from the design engineer, to accommodate suspended ceiling fixings.
29 March 2021
CROSS Safety Report
Report ID: 829
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Snow loading in Scotland - summary of reports
There were heavy snowfalls over the entire United Kingdom in the winters of 2009/2010 and 2010/2011 and CROSS received a number of reports, mostly from Scotland where a significant number of buildings suffered roof collapses.
1 July 2011
CROSS Safety Report
Report ID: 264
Region: CROSS-UK
Nuts falling from tension glazing system
A reporter raises concerns about the fixings used in a tension glazing system.
1 July 2013
CROSS Safety Report
Report ID: 340
Region: CROSS-UK
Further concerns about competence
A reporter raises concerns about competency, and the points raised demonstrate, says the reporter, a poor grasp first-principles on the part of many designers.
1 July 2013
CROSS Safety Report
Report ID: 339
Region: CROSS-UK
Further issues with freezing and galvanised hollow sections
A reporter was involved in correcting a cold formed galvanised square hollow section (SHS) four storey balcony structure where longitudinal splits formed in at least two of the four columns.
1 January 2014
CROSS Safety Report
Report ID: 314
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.