Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (9)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (22)
- Excavation (1)
- Extension project (5)
- Groundworks project (1)
- Maintenance project (1)
- New build (3)
- Refurbishment (6)
- Remediation project (3)
- Repair project (4)
- Structural assessment (2)
Method of construction
Elements & systems
Plant & equipment
Utilities
Safety reporting
Business practice
Public incidents
Content type
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (4)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (1)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 2 (1)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (3)
- CROSS Safety Report (25)
- Third party content (1)
- Third party content (1)
CROSS regions
Structural safety when designing lean in the climate emergency
The IStructE Safety, Health and Wellbeing Panel considers the safety implications when aspiring to a lean design.
4 January 2021
Third party content
Publisher: The Institution of Structural Engineers
'Design' for alterations to a dwelling carried out by an unsuitable person
A reporter was called upon to review a design for the removal of a loadbearing wall during the refurbishment of a residence. A builder was already on site but had stopped work since they considered the engineering design to be unsatisfactory and the structural designer was not responding to their queries. The reporter found that the structural design being followed was far from competent.
21 August 2023
CROSS Safety Report
Report ID: 1236
Region: CROSS-UK
Quick and cheap design calculations
A reporter raises concerns about poor design calculation being provided through a website at a very low price.
1 January 2014
CROSS Safety Report
Report ID: 411
Region: CROSS-UK
Coliseum failure
This is a legacy case study of the 1978 collapse of the roof of the Hartford Coliseum in Hartford, Connecticut.
1 March 2020
CROSS Safety Report
Report ID: 892
Region: CROSS-US
Failure of existing long-span wood roof truss following installation of new roof-top HVAC units
Failure of an existing long-span wood roof truss following installation of new roof-top Heating, Ventilating, and Air Conditioning (HVAC) units offers lessons in the special challenges of renovations to existing buildings.
1 September 2020
CROSS Safety Report
Report ID: 949
Region: CROSS-US
Overall stability of building proposed to be provided by metal framing and plasterboard
Metal framing and plasterboard was used to provide lateral stability to a building. The form of construction was later deemed to be unsuitable and extensive remedial works had to be carried out.
24 May 2023
CROSS Safety Report
Report ID: 468
Region: CROSS-UK