Safety information search results
Filter your results
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (11)
- CROSS Newsletter (8)
- CROSS Safety Report (15)
- News [sub-heading only] (5)
CROSS regions
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Columns missing due to 3D modelling
A new eight storey residential concrete frame building was being constructed and several columns were omitted from the ground and first floor level drawings, says a reporter.
1 January 2017
CROSS Safety Report
Report ID: 614
Region: CROSS-UK
Inadequate structural design of school extension
On review of a design for a school extension, a reporter noted several major issues including an almost total lack of vertical bracing throughout the extension.
1 October 2016
CROSS Safety Report
Report ID: 597
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Architect conducts structural design of sway frame for domestic project
A reporter looked at a project recently where the drawings had been produced by the architect, including a structural design.
1 April 2018
CROSS Safety Report
Report ID: 678
Region: CROSS-UK