Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (10)
- CROSS Newsletter (3)
- CROSS Safety Report (19)
CROSS regions
Unsafe design of retrofit cantilever balconies
A structural assessment of a number of new balconies being added to an existing building revealed critical concerns in respect of fixings back into the existing brickwork.
26 August 2022
CROSS Safety Report
Report ID: 1128
Region: CROSS-UK
Metal cladding panels fail and fall to ground
During high winds, a number of metal cladding panels failed and fell to the ground from a tall commercial building in a major UK city.
26 August 2022
CROSS Safety Report
Report ID: 1134
Region: CROSS-UK
Glued on stainless steel panels fall
A ceiling in a retail setting was designed to be faced with reflective finish panels. The contractor proposed stainless steel bonded to MDF with folded edges and concealed mechanical restraint. The designer overruled the contractor and selected an adhesive-only solution which was implemented. Some months later, several panels failed, with some stainless steel facings falling to the floor.
20 February 2023
CROSS Safety Report
Report ID: 1187
Region: CROSS-UK
Poorly applied external insulation on buildings
This report concerns external insulation on buildings being inadequately applied and fixed, with poor control of the workmanship standards, leading to potential safety concerns and damage to the property.
21 August 2023
CROSS Safety Report
Report ID: 1203
Region: CROSS-UK
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
Failure of blind bolts
There was a partial collapse of a steel frame building due to the failure of some blind bolts during the construction period. Loads at the time were well below anticipated failure levels.
1 April 2007
CROSS Safety Report
Report ID: 71
Region: CROSS-UK
Timber truss
The reporter has been dealing with an application where the engineer involved discovered proprietary timber girder trusses with some glued joints that have come loose.
1 February 2007
CROSS Safety Report
Report ID: 62
Region: CROSS-UK
Ceiling collapse in an educational building
A suspended ceiling in a large teaching hall collapsed days before the official opening of a new educational building.
1 April 2008
CROSS Safety Report
Report ID: 100
Region: CROSS-UK
Suspended granite ceiling collapse
This report is in relation to the selection of fixings for a suspended ceiling of granite which collapsed in the entrance area of a new office building due to failures of the fixings.
1 January 2010
CROSS Safety Report
Report ID: 148
Region: CROSS-UK
School fascia board failure
A section of pressed steel gutter and plywood fascia board at a school collapsed during or after a heavy rainstorm.
1 April 2009
CROSS Safety Report
Report ID: 137
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.