Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (15)
- CROSS Newsletter (11)
- CROSS Safety Report (22)
- News [sub-heading only] (6)
CROSS regions
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Modern methods of construction and robustness
This report relates to the design of a low rise modular building and the requirement, or otherwise, for positive fixings between the superstructure and the substructure.
24 May 2023
CROSS Safety Report
Report ID: 1179
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Slipform temporary works design
A reporter was performing a CAT III check on a 14 storey slipform design when they discovered that the temporary works design was inadequate.
5 September 2022
CROSS Safety Report
Report ID: 809
Region: CROSS-UK
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
Low pitched metal sheet roofs
A reporter is concerned about low pitch metal sheet roofing attached to trussed rafters.
1 April 2007
CROSS Safety Report
Report ID: 66
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Stability of timber frame construction
A reporter who has many years design experience in timber frame construction raises concerns about a common defect they have experienced when checking calculations.
1 February 2007
CROSS Safety Report
Report ID: 51
Region: CROSS-UK
Design of tall asymmetric structures
A reporter touches on the topic of analysis and design of the structural systems for tall buildings which are asymmetric and may be irregular in plan.
1 April 2011
CROSS Safety Report
Report ID: 238
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.