Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Weld de-specification without design approval
A reporter's firm was engaged as fabricators for a main contractor and asked by them to de-specify full and partial penetration butt welds and replace them with fillet welds without approval from the main design engineer.
14 October 2020
CROSS Safety Report
Report ID: 845
Region: CROSS-UK
Workmanship in domestic buildings
A reporter has raised concerns after discovering a steel beam on site had its web cut away at the support without approval from the design engineer.
14 October 2020
CROSS Safety Report
Report ID: 971
Region: CROSS-UK
Execution not matching design assumptions
This report highlights how the connection of steel columns to twin beams acting as a transfer beam was overlooked and created an eccentric loading condition.
14 October 2020
CROSS Safety Report
Report ID: 968
Region: CROSS-UK
Inadequate billets used in precast concrete connections
Whilst completing a third-party design appraisal, a correspondent found that solid steel billets intended to form the primary shear transfer mechanism between concrete beams and columns were insufficient for this purpose.
1 April 2019
CROSS Safety Report
Report ID: 705
Region: CROSS-UK