Safety information search results
Filter your results
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (11)
- CROSS Newsletter (9)
- CROSS Safety Report (15)
- News [sub-heading only] (5)
CROSS regions
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Lack of experience on steel column erection
A reporter highlights how works progressed on site without a detailed method statement being provided by the contractor even though it had been requested.
1 April 2013
CROSS Safety Report
Report ID: 324
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Contractor uses incorrect fixing bolts for masonry support angles
A correspondent noticed that proprietary masonry support angles specified to support the outer leaf of masonry had been incorrectly connected to the steel beam using carriage bolts.
1 July 2019
CROSS Safety Report
Report ID: 794
Region: CROSS-UK
Weld de-specification without design approval
A reporter's firm was engaged as fabricators for a main contractor and asked by them to de-specify full and partial penetration butt welds and replace them with fillet welds without approval from the main design engineer.
14 October 2020
CROSS Safety Report
Report ID: 845
Region: CROSS-UK
Steel balconies fixed to precast hollowcore floor planks
A reporter is concerned about the suitability of providing a retrofitted steel balcony requiring moment connections to the sides of typical hollowcore floor planks.
1 July 2017
CROSS Safety Report
Report ID: 620
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.