Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Locations
Content type
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK [sub-heading only] (9)
- CROSS Newsletter (2)
- CROSS Safety Alert (2)
- CROSS Safety Report (18)
CROSS regions
Concrete system buildings - need for period inspection
Evidence of corrosion of tendons in post-tensioned components came to light which was associated with exposure of tendons to moisture in voids in ducts and sometimes also the presence of chlorides.
1 December 2001
CROSS Safety Alert
Region: CROSS-UK
Reinforced aerated autoclaved concrete planks found on pitched roof of 1990s hospital building
A building constructed in the early 1990s has been found to contain reinforced aerated autoclaved concrete (RAAC) planks. This date is important since it is much later than the previously thought last significant use of RAAC in buildings in the UK and potentially affects the scope of buildings that could require screening for RAAC problems.
26 August 2022
CROSS Safety Report
Report ID: 1125
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
RAAC assessment undertaken by persons not suitably experienced
A reinforced aerated autoclaved concrete (RAAC) assessment was carried out by persons who did not appear to have appropriate experience, potentially putting building users at risk of harm.
21 August 2023
CROSS Safety Report
Report ID: 1224
Region: CROSS-UK
Failure of reinforced autoclaved aerated concrete (RAAC) planks
In late 2018, the Local Government Association (LGA) and the Department for Education (DfE) contacted all school building owners to draw attention to a recent failure involving a flat roof There was little warning of the sudden collapse.
1 May 2019
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Structural corrosion in a swimming pool building causes concern
A survey showed severe corrosion of previously repaired steelwork columns adjacent to a public swimming pool.
30 July 2021
CROSS Safety Report
Report ID: 1004
Region: CROSS-UK
Precast concrete planks - durability and potential safety concerns
A reporter raises concerns over the recent collapses of precast concrete floor units that are installed throughout the UK.
1 April 2007
CROSS Safety Report
Report ID: 77
Region: CROSS-UK
Aerated concrete slabs
A reporter discusses the failure of precast reinforced autoclaved aerated concrete (RAAC) slabs during construction.
1 October 2007
CROSS Safety Report
Report ID: 55
Region: CROSS-UK, CROSS-AUS, CROSS-US
Car park staircase collapse at construction joint
The top flight of a staircase to a multi-storey concrete car park collapsed approximately 10 years after construction.
1 July 2008
CROSS Safety Report
Report ID: 106
Region: CROSS-UK
Further Multi-Storey Car Park (MSCP) concerns
A reporter raises their concerns over the potential safety issue of older car parks that are suffering neglect through lack of inspection and routine maintenance.
1 January 2009
CROSS Safety Report
Report ID: 127
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.