Safety information search results
Filter your results
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (8)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (17)
- Demolition project (1)
- Extension project (8)
- Maintenance project (1)
- New build (8)
- Refurbishment (6)
- Remediation project (4)
- Repair project (4)
- Strengthening project (1)
- Structural assessment (1)
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 2 (2)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (10)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (7)
- CROSS Safety Report (28)
- News [sub-heading only] (4)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Wall tie design between masonry panels and timber frames
This report discusses the potential for failure of timber frame wall ties between masonry and timber in moderate to high wind conditions.
1 January 2020
CROSS Safety Report
Report ID: 832
Region: CROSS-UK
Propping of post-tensioned slabs during construction
A reporter raises their concerns after an infill slab strip was not poured in time which resulted in overloading of the slab below during a concrete pour.
1 April 2020
CROSS Safety Report
Report ID: 873
Region: CROSS-UK
Poor quality of structural design on high-rise buildings
The correspondent has been very concerned about the quality of structural engineering on some projects in recent years, particularly for certain high-rise buildings.
1 July 2019
CROSS Safety Report
Report ID: 823
Region: CROSS-AUS
Roof collapse at primary school
Blocked drainage outlets likely lead to the build-up of water on a school roof which collapsed.
1 July 2020
CROSS Safety Report
Report ID: 958
Region: CROSS-UK
Execution not matching design assumptions
This report highlights how the connection of steel columns to twin beams acting as a transfer beam was overlooked and created an eccentric loading condition.
14 October 2020
CROSS Safety Report
Report ID: 968
Region: CROSS-UK
Inadequate punching shear reinforcement in flat slabs
This report highlights how remedial works were required in a number of residential buildings after inadequate punching shear reinforcement was identified.
14 October 2020
CROSS Safety Report
Report ID: 950
Region: CROSS-UK
Post-tensioned slab failure during tendon stressing operations
A reporter disseminates the lessons learned after the end of a slab burst while stressing the tendons in a post-tensioned concrete slab.
1 April 2020
CROSS Safety Report
Report ID: 882
Region: CROSS-UK
Dangerous substitution of lintels on domestic projects
This report highlights the structural risk of substituting lintels during domestic projects without approval from the design engineer.
1 April 2020
CROSS Safety Report
Report ID: 889
Region: CROSS-UK