Safety information search results
Filter your results
Building or structure type
- Bridges (8)
- (-)
Buildings
(123)
- Agricultural buildings (1)
- Commercial (8)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (4)
- Health care (1)
- Higher-risk buildings (1)
- Industrial buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (39)
- Stadiums (1)
- Storage buildings (2)
- Tall buildings (5)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Buried pipes & culverts (1)
- Car parks (2)
- Flats & apartments (7)
- Hotels & hostels (1)
- Houses (20)
- Railways (1)
- Reservoirs & dams (1)
- Retaining structures (6)
- Roads (1)
- Sewers (1)
- Temporary structures (2)
Materials
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (19)
- Conservation & restoration project (1)
- (-) Construction project [sub-heading only] (123)
- Excavation (5)
- Extension project (9)
- Groundworks project (1)
- Maintenance project (1)
- New build (66)
- Refurbishment (8)
- Remediation project (10)
- Repair project (5)
- Strengthening project (3)
- Structural assessment (2)
- Underpinning project (3)
Method of construction
Elements & systems
- Balconies (5)
- Balustrades (6)
- Basements (5)
- Beams (25)
- Bracing (8)
- Canopies (1)
- Ceilings (1)
- Cladding (10)
- Columns (17)
- Fasteners & connections (32)
- Fire protection (1)
- Foundations (12)
- Insulation (4)
- Light gauge steel framing (2)
- Lintels (3)
- Padstones (4)
- Parapets (2)
- PV panels (1)
- Roofs (12)
- Sandwich panels (1)
- Signs (1)
- Slabs (16)
- Tendons (1)
- Trusses (4)
- Wall head restraints (2)
- Walls (30)
- Wall ties (5)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 17 (2)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 21 (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (5)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (3)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (5)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (3)
- CROSS-UK [sub-heading only] (76)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (50)
- CROSS Safety Report (123)
- News [sub-heading only] (16)
CROSS regions
Missing starter bars
During an inspection the reporter observed that all the continuity starter bars projecting from the wall kicker were in fact loose.
1 July 2007
CROSS Safety Report
Report ID: 37
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Embankment stability concerns after heavy rainfall
During the construction of a building the top edge of the steepest section of an embankment moved outwards and downwards after a period of heavy rainfall.
1 November 2005
CROSS Safety Report
Report ID: 3
Region: CROSS-UK
Collapse of a wall during construction
An internal corridor wall collapsed in a school under construction.
1 April 2008
CROSS Safety Report
Report ID: 99
Region: CROSS-UK
Inadequate foundation reinforcement
Subcontractors carrying out the ground works for a multi-storey development failed to provide sufficient continuity reinforcement in the ground beams.
1 October 2008
CROSS Safety Report
Report ID: 112
Region: CROSS-UK
House collapse
This is a case of collapse caused by a builder not carrying out underpinning works as detailed by the design engineer.
1 January 2009
CROSS Safety Report
Report ID: 128
Region: CROSS-UK
Advice wanted by amateur builder
This notice, seen by a reporter, was posted on a DIY website, and whilst it may be apocryphal, it illustrates the type of queries received by local authorities and building regulations officers.
1 January 2009
CROSS Safety Report
Report ID: 125
Region: CROSS-UK
Shop/domestic building collapse
A two storey corner (end of terrace) property fronting a very busy, narrow major route collapsed during the construction of a new basement.
1 January 2009
CROSS Safety Report
Report ID: 123
Region: CROSS-UK
Temporary works propping
A reporter raises concerns about the adequacy of temporary works that were installed on site during the refurbishing of a large office building.
1 January 2010
CROSS Safety Report
Report ID: 146
Region: CROSS-UK
Concerns on stability require prompt action
A reporter was concerned about overall building stability during an extension and conversion project.
1 January 2010
CROSS Safety Report
Report ID: 171
Region: CROSS-UK