Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (2)
- Assessment project [sub-heading only] (4)
- Construction project [sub-heading only] (19)
- Demolition project (4)
- Excavation (1)
- Extension project (2)
- Fire safety assessment (2)
- Groundworks project (1)
- New build (8)
- Refurbishment (1)
- Remediation project (1)
- Structural assessment (4)
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (18)
- CROSS Newsletter (11)
- CROSS Safety Alert (2)
- CROSS Safety Report (31)
- CROSS Topic Paper (5)
- News [sub-heading only] (4)
- Safety information from CROSS [sub-heading only] (2)
CROSS regions
Reinforced aerated autoclaved concrete planks found on pitched roof of 1990s hospital building
A building constructed in the early 1990s has been found to contain reinforced aerated autoclaved concrete (RAAC) planks. This date is important since it is much later than the previously thought last significant use of RAAC in buildings in the UK and potentially affects the scope of buildings that could require screening for RAAC problems.
26 August 2022
CROSS Safety Report
Report ID: 1125
Region: CROSS-UK
Toughened glass failures
The number of failures of heat-soaked toughened glass leads to a finding that the glass produced by some processors has not been properly heat-soaked and is therefore much more likely to shatter in use.
17 November 2022
CROSS Safety Report
Report ID: 1135
Region: CROSS-UK
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Concerns over execution class categorisation of steel pedestrian bridge
A reporter is concerned in respect of the steelwork execution class, and quality management arrangements, applied to the construction of a public access pedestrian bridge.
21 November 2022
CROSS Safety Report
Report ID: 1149
Region: CROSS-UK
RAAC planks in a 1970s shopping centre
An existing large shopping centre built circa 1975 had a number of external storerooms and loading bays with roofs constructed using reinforced autoclaved aerated concrete (RAAC) planks. The planks had deflected to the extent that they needed replacing.
20 February 2023
CROSS Safety Report
Report ID: 1155
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Structural stability/integrity of steel frame buildings
There are occasional collapses of steel frame structures during construction and this Alert is to draw attention to matters which need to be borne in mind by designers, fabricators, and contractors.
1 February 2017
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Hazard identification for structural design
At the outset of the design, it is recommended that the structural engineer should document the proposed structural design philosophy and the approach to design against disproportionate collapse and agree this with the client.
1 September 2017
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Fire exit chained closed due to COVID-19 concerns
A key pad operated fire exit was chained closed to prevent the spread of COVID-19.
13 August 2021
CROSS Safety Report
Report ID: 975
Region: CROSS-UK
Fire safety concern over green walls
This report discusses how building close down procedures that include isolating automated water systems might result in the drying out of green walls, thus presenting a significant fire hazard in external walls.
13 August 2021
CROSS Safety Report
Report ID: 976
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.