Safety information search results
Filter your results
Building or structure type
- Bridges (18)
- (-)
Buildings
(514)
- Agricultural buildings (9)
- Commercial (48)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (38)
- Health care (16)
- Higher-risk buildings (6)
- Industrial buildings (23)
- Laboratory buildings (1)
- LPS buildings (3)
- Nuclear & energy buildings (2)
- Public, religious & civic buildings (14)
- Recreational buildings (9)
- Residential (149)
- Stadiums (6)
- Storage buildings (11)
- Tall buildings (23)
- Theatres & other entertainment buildings (11)
- Transport buildings (6)
- Buried pipes & culverts (1)
- Car parks (18)
- Flats & apartments (62)
- Floating structures (1)
- Freestanding walls (3)
- Hotels & hostels (13)
- Houses (55)
- Marine structures (2)
- Masts & towers (4)
- Railways (4)
- Reservoirs & dams (1)
- Retaining structures (11)
- Roads (2)
- Sewers (1)
- Temporary structures (7)
Building height
- 5m or higher, but lower than 11m (24)
- 5m or higher, but lower than 12m (4)
- 11m or higher, but lower than 18m (15)
- 18m or higher, but lower than 30m (12)
- 30m or higher (9)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK [sub-heading only] (21)
- CROSS-US [sub-heading only] (2)
- Lower than 5m (5)
- Lower than 5m (2)
Materials
Project or lifecycle stage
Design
- BIM (3)
- Computational design (11)
- Design: quality management (45)
- Design calculations (54)
- Design conceptualisation (29)
- Design detailing (90)
- Design drawings (27)
- Design loads (81)
- Design software (22)
- Dynamics (10)
- Fire safety design (15)
- Resilience (19)
- Robustness (49)
- Structural design (89)
- Sustainability (6)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (39)
- Assessment project [sub-heading only] (18)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (182)
- Demolition project (11)
- Excavation (7)
- Extension project (19)
- Fire safety assessment (2)
- Groundworks project (1)
- Maintenance project (3)
- New build (87)
- Refurbishment (19)
- Remediation project (20)
- Repair project (7)
- Strengthening project (6)
- Structural assessment (27)
- Underpinning project (4)
Construction period
Method of construction
Elements & systems
- Arch (2)
- Balconies (17)
- Balustrades (20)
- Basements (13)
- Beams (55)
- Bracing (17)
- Cables (1)
- Canopies (8)
- Ceilings (23)
- Cladding (35)
- Columns (38)
- Fasteners & connections (110)
- Fences (1)
- Fire exit doors (2)
- Fire protection (15)
- Foundations (22)
- Insulation (10)
- Light gauge steel framing (7)
- Lintels (4)
- Padstones (5)
- Parapets (10)
- PV panels (3)
- Roofs (78)
- Sandwich panels (3)
- Shear walls (4)
- Signs (2)
- Slabs (48)
- Tendons (2)
- Trusses (10)
- Wall head restraints (3)
- Walls (73)
- Wall ties (14)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (2)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 8 (2)
- CROSS-AUS [sub-heading only] (4)
- CROSS-UK Newsletter 1 (6)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (3)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (6)
- CROSS-UK Newsletter 6 (5)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (4)
- CROSS-UK Newsletter 10 (6)
- CROSS-UK Newsletter 11 (3)
- CROSS-UK Newsletter 12 (7)
- CROSS-UK Newsletter 13 (4)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (3)
- CROSS-UK Newsletter 17 (4)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 19 (4)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 23 (7)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 31 (5)
- CROSS-UK Newsletter 32 (5)
- CROSS-UK Newsletter 33 (7)
- CROSS-UK Newsletter 34 (4)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (5)
- CROSS-UK Newsletter 38 (4)
- CROSS-UK Newsletter 39 (4)
- CROSS-UK Newsletter 40 (4)
- CROSS-UK Newsletter 41 (6)
- CROSS-UK Newsletter 42 (4)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (4)
- CROSS-UK Newsletter 46 (4)
- CROSS-UK Newsletter 47 (6)
- CROSS-UK Newsletter 48 (6)
- CROSS-UK Newsletter 49 (6)
- CROSS-UK Newsletter 50 (6)
- CROSS-UK Newsletter 51 (6)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (6)
- CROSS-UK Newsletter 55 (5)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (4)
- CROSS-UK Newsletter 58 (8)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (6)
- CROSS-UK Newsletter 61 (3)
- CROSS-UK Newsletter 62 (7)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (8)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (9)
- CROSS-UK [sub-heading only] (231)
- CROSS-US Newsletter 1 (3)
- CROSS-US Newsletter 2 (6)
- CROSS-US Newsletter 3 (5)
- CROSS-US [sub-heading only] (8)
- CROSS Feature Article (1)
- CROSS Newsletter (141)
- CROSS Safety Alert (12)
- CROSS Safety Report (482)
- CROSS Theme Page (1)
- CROSS Topic Paper (9)
- News [sub-heading only] (45)
- Safety information from CROSS [sub-heading only] (4)
- Safety information [sub-heading only] (5)
- Third party content (9)
- Third party content (5)
CROSS regions
Cantilevered brickwork - fatal collapse during construction
A blade of 270mm cavity brickwork in a temporary condition fell and killed a bricklayer after sixteen scaffold planks were leant against the wall on the side remote from the bricklayer.
1 April 2015
CROSS Safety Report
Report ID: 476
Region: CROSS-UK
Dangerous alterations to steel beam supports
A local authority building control officer went to site and witnessed on an upper floor that the columns had been removed out of sequence, before the new frame had been constructed.
1 October 2015
CROSS Safety Report
Report ID: 479
Region: CROSS-UK
Gallows brackets for supporting chimney breasts
A reporter has seen suggestions that gallows brackets are suitable for support after the removal of internal chimney breasts.
1 October 2015
CROSS Safety Report
Report ID: 481
Region: CROSS-UK
Unbraced temporary props
An alarming photograph has been sent by a contributor.
1 January 2015
CROSS Safety Report
Report ID: 482
Region: CROSS-UK
Alteration to historic column bases causes settlement issues
Historic timber columns settled and tilted after unauthorised changes were made to their foundation bases.
1 October 2014
CROSS Safety Report
Report ID: 458
Region: CROSS-UK
Large stone panel falls from building façade
A reporter witnessed a large stone panel detach from a second floor beam and fall to the ground, narrowly missing a group of school children.
1 July 2019
CROSS Safety Report
Report ID: 467
Region: CROSS-UK
Stability of terraced buildings
A reporter is concerned about a terrace of four buildings the third of which is being opened up.
1 April 2015
CROSS Safety Report
Report ID: 448
Region: CROSS-UK
Open balustrade balconies over a public highway
A reporter raises concerns about the construction of a large residential development adjacent to a public highway where the balconies over sail the footpath.
1 October 2015
CROSS Safety Report
Report ID: 495
Region: CROSS-UK
Collapsed section of dwelling built of cob construction
A reporter says that a traditional cottage built of cob construction collapsed without warning in 2016.
1 April 2017
CROSS Safety Report
Report ID: 609
Region: CROSS-UK
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK