Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK [sub-heading only] (24)
- CROSS Newsletter (15)
- CROSS Safety Alert (2)
- CROSS Safety Report (41)
- CROSS Topic Paper (1)
- News [sub-heading only] (1)
CROSS regions
Use of water filled containers to anchor temporary structures
The reporter who is a local authority Environmental Health Officer raises concerns over the use of water filled plastic containers being used as anchors/ballast at festivals.
1 July 2011
CROSS Safety Report
Report ID: 255
Region: CROSS-UK
Concerns with propping design to large excavations
Concerns are raised about the design of propping to large excavations and particularly about the design of the connections for a raking prop to a horizontal waler.
1 January 2019
CROSS Safety Report
Report ID: 298
Region: CROSS-UK
Example of small temporary stage structure
This is an example of a small stage that is potentially unstable.
1 January 2013
CROSS Safety Report
Report ID: 302
Region: CROSS-UK
Set up of temporary works
This report highlights the importance of following correct procedures when installing temporary works.
1 July 2019
CROSS Safety Report
Report ID: 797
Region: CROSS-AUS
Mobile scaffold tower falls 7 storeys
A mobile tower, which was not being used, toppled over the guardrail and fell 7 storeys (27m) to the ground.
1 April 2014
CROSS Safety Report
Report ID: 436
Region: CROSS-UK
Mobile message board in strong wind
A reporter raises concerns over mobile message boards adjacent to motorways after one moved into the motorway lane in windy conditions.
1 January 2015
CROSS Safety Report
Report ID: 437
Region: CROSS-UK
Failure of precast concrete 'L' shaped retaining wall
A recent incident occurred on a site, where a temporary precast retaining wall failed leading to a pile of clay approximately 3m high spilling through the wall.
1 July 2014
CROSS Safety Report
Report ID: 433
Region: CROSS-UK
Failure of epoxy resin bonded anchors in concrete
A reporter expresses concern about adhesive bonded anchors after anchors failed progressively on site during a lifting operation.
1 April 2014
CROSS Safety Report
Report ID: 429
Region: CROSS-UK
Failure of anchor bolts holding suspended scaffold
During the removal of a suspended scaffold, it was found that a number of the screw bolt anchors had failed.
1 July 2015
CROSS Safety Report
Report ID: 430
Region: CROSS-UK
Unsafe timber scaffolding
Concerns were raised after a reporter observed a rickety temporary scaffold that had been constructed from 4”x2” (100mm x 50mm) timbers.
1 April 2014
CROSS Safety Report
Report ID: 407
Region: CROSS-UK