Safety information search results
Filter your results
Building height
Materials
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Mobile phone masts
The concern of an overseas reporter is that erection, foundation design and construction, and maintenance of mobile phone masts are not carried out adequately.
1 March 2006
CROSS Safety Report
Report ID: 22
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Failure of waling beam connected to raking prop
A reporter discusses how they witnessed the failure of a temporary support for an excavation on site due to similar design issues discussed in CROSS report 298 (Props to large excavations).
1 July 2019
CROSS Safety Report
Report ID: 813
Region: CROSS-UK
Fibrous plaster ceiling features
This recent report of a serious concern about an old fibrous plaster ceiling has similarities to the Apollo Theatre ceiling collapse in London in December 2013.
1 July 2015
CROSS Safety Report
Report ID: 518
Region: CROSS-UK
Safety concerns with twin wall system
A reporter raises safety concerns over the temporary stability of twin wall systems after they observed failures during construction.
1 April 2014
CROSS Safety Report
Report ID: 402
Region: CROSS-UK
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Wind damage to roof with PV panels
A reporter describes how during a heavy storm a big area of roof tiles that were adjacent to PV panels blew down.
1 October 2016
CROSS Safety Report
Report ID: 590
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.