Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (31)
- CROSS Newsletter (23)
- (-) CROSS Safety Report (50)
- News [sub-heading only] (6)
CROSS regions
Designed scaffold built incorrectly
A Temporary Works Coordinator (TWC) found that scaffolding was not constructed in accordance with the approved design drawings and a number of unauthorised modifications had been made.
1 January 2018
CROSS Safety Report
Report ID: 701
Region: CROSS-UK
Scaffold lifting beams incorrectly installed
During the inspection of scaffolding prior to loading, it was observed that there were lifting beams with end stops and ultimate stop cross bolts incorrectly installed.
1 January 2018
CROSS Safety Report
Report ID: 702
Region: CROSS-UK
Incorrect scaffold installation
A reporter describes how the Temporary Works Coordinator observed that tension connections on standards for a scaffold system were either omitted or had incorrect pins/bolts used.
1 January 2018
CROSS Safety Report
Report ID: 700
Region: CROSS-UK
Design deficiencies in long span steelwork portal
A firm commissioned to design steel joints on a large portal frame structure noticed that there was lack of restraint to a series of long span rafters.
1 October 2013
CROSS Safety Report
Report ID: 329
Region: CROSS-UK
Padstones out of position leads to collapse
This report concerns the partial collapse of a terrace of four storey houses during construction due to padstones being placed incorrectly.
1 April 2017
CROSS Safety Report
Report ID: 602
Region: CROSS-UK
Compatibility at RC column to slab joint - strong column/weak slab
A reporter who was reviewing the structural design of a commercial building raises concerns over the compatibility at column/slab joints when different grades of concrete are used.
1 April 2012
CROSS Safety Report
Report ID: 296
Region: CROSS-UK
GRP panels as permanent shuttering
A reporter highlights problems that were encountered when Glassfibre Reinforced Plastic (GRP) panels were used as permanent formwork on a highway construction project.
1 October 2012
CROSS Safety Report
Report ID: 342
Region: CROSS-UK
Inadequate steel beam splice
A reporter raises concerns of an inadequate steel beam splice they came across on site.
1 October 2013
CROSS Safety Report
Report ID: 343
Region: CROSS-UK
Unconnected steel beam connection
A reporter describes how they came across a completely inadequate steel connection while attending site for another matter.
1 October 2017
CROSS Safety Report
Report ID: 646
Region: CROSS-UK
Failure of pile load test arrangement
A pile was being load-tested, for confirmation of design pile loads for the foundations of a road bridge, when the web of the deep steel beam used in the testing arrangement buckled.
1 January 2015
CROSS Safety Report
Report ID: 484
Region: CROSS-UK