Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (24)
- CROSS Newsletter (17)
- (-) CROSS Safety Report (34)
- News [sub-heading only] (7)
CROSS regions
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Concerns over execution class categorisation of steel pedestrian bridge
A reporter is concerned in respect of the steelwork execution class, and quality management arrangements, applied to the construction of a public access pedestrian bridge.
21 November 2022
CROSS Safety Report
Report ID: 1149
Region: CROSS-UK
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Mobile phone masts
The concern of an overseas reporter is that erection, foundation design and construction, and maintenance of mobile phone masts are not carried out adequately.
1 March 2006
CROSS Safety Report
Report ID: 22
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Timber truss
The reporter has been dealing with an application where the engineer involved discovered proprietary timber girder trusses with some glued joints that have come loose.
1 February 2007
CROSS Safety Report
Report ID: 62
Region: CROSS-UK
Collapse of tank falsework
This report relates to the collapse of falsework erected to construct an in situ, reinforced concrete, circular water retaining structure.
1 October 2009
CROSS Safety Report
Report ID: 150
Region: CROSS-UK
Learning from historic failures
This report is not to discuss or preempt the findings of the investigation but to draw attention to historical failures where ground conditions have been highlighted in subsequent Health and Safety Executive (HSE) reports on the incidents.
1 January 2010
CROSS Safety Report
Report ID: 154
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.