Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Locations
CROSS regions
Concrete half joints
Poor reinforcement detailing and installation in a half joint led to the collapse of a series of beams and precast concrete slabs.
1 January 2008
CROSS Safety Report
Report ID: 88
Region: CROSS-UK
Precast joint failures
A reporter is interested in CROSS’s evidence about joint failures in concrete. They feel that the same failures keep arising from similar circumstances with none of the lessons having been learnt.
1 July 2008
CROSS Safety Report
Report ID: 107
Region: CROSS-UK
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Risks from off-site manufacture and hybrid construction
A reporter was recently investigating a ‘near miss’ involving concrete construction in which pre-cast and in-situ concrete were used in combination.
1 January 2016
CROSS Safety Report
Report ID: 529
Region: CROSS-UK
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.