Safety information search results
Filter your results
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (6)
- CROSS Newsletter (6)
- CROSS Safety Report (8)
- News [sub-heading only] (3)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Failure of waling beam connected to raking prop
A reporter discusses how they witnessed the failure of a temporary support for an excavation on site due to similar design issues discussed in CROSS report 298 (Props to large excavations).
1 July 2019
CROSS Safety Report
Report ID: 813
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Fabrication different from design drawings
A reporter shares their experience of how a propping design they had undertaken was fabricated and installed but not in accordance with the design drawings.
1 July 2015
CROSS Safety Report
Report ID: 513
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.