Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
- Computational design (1)
- Design: quality management (4)
- Design calculations (9)
- Design conceptualisation (3)
- Design detailing (22)
- Design drawings (7)
- Design loads (10)
- Design software (4)
- Dynamics (3)
- Fire safety design (1)
- Resilience (2)
- Robustness (5)
- (-) Structural design (50)
- Sustainability (1)
Operation or occupation
Fire incident response
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (4)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (29)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (19)
- CROSS Safety Alert (4)
- CROSS Safety Report (45)
- CROSS Topic Paper (1)
- News [sub-heading only] (6)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
The management of design related risks: structural, civil and fire engineers
Significant, and tragic, failures involving structures continue to occur: fires in apartment blocks in Milan, London and Taiwan, and structural collapses in Florida and Nigeria being recent examples. This paper gives emphasis to the need for engineers to consider risk management at a fundamental level.
15 December 2021
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Tension cable and rod connectors
In a number of instances, suspension fork connectors for high strength steel bars (cables or rods) acting in tension have failed at loads well below the intended design capacity or have been found to be substandard either during construction or in service.
1 August 2012
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
The use of cast-in ferrules as structural connections
This report highlights several problems that can arise with structural connections between elements when cast-in ferrules (also known as threaded inserts) are used for the anchorage of reinforcing bars.
30 April 2021
CROSS Safety Report
Report ID: 993
Region: CROSS-AUS
Steel column erection anchoring connection failure injured worker
This report describes how a construction worker was injured during the erection of a steel column due to shortcomings in erection procedures and inadequacies in a column base connection.
10 May 2021
CROSS Safety Report
Report ID: 992
Region: CROSS-US
Photovoltaic installations - structural aspects
CROSS has concerns about some structural aspects of roof mounted PV and solar thermal panels.
1 November 2016
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Structural stability/integrity of steel frame buildings
There are occasional collapses of steel frame structures during construction and this Alert is to draw attention to matters which need to be borne in mind by designers, fabricators, and contractors.
1 February 2017
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Accidental partial demolition of a beam
During a site visit, the permanent works design engineer noticed that hydro-demolition of the end of a floor supporting beam had taken place out of sequence. This introduced a pattern of bending moments and shear forces that were not considered in the original design.
6 April 2023
CROSS Safety Report
Report ID: 855
Region: CROSS-UK
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS