Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK [sub-heading only] (14)
- CROSS Newsletter (10)
- CROSS Safety Alert (1)
- CROSS Safety Report (17)
- News [sub-heading only] (4)
CROSS regions
Tension cable and rod connectors
In a number of instances, suspension fork connectors for high strength steel bars (cables or rods) acting in tension have failed at loads well below the intended design capacity or have been found to be substandard either during construction or in service.
1 August 2012
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Overloading a portal frame with suspended services
A reporter designing a single storey portal frame used a standard roof service loading of 0.25kN/m2. After the project was completed, a tenant for the unit took over fit out and added a considerable amount of sprinkler pipework into the roof. This created local overloading.
21 August 2023
CROSS Safety Report
Report ID: 1195
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Nuts falling from tension glazing system
A reporter raises concerns about the fixings used in a tension glazing system.
1 July 2013
CROSS Safety Report
Report ID: 340
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Inadequate steel beam splice
A reporter raises concerns of an inadequate steel beam splice they came across on site.
1 October 2013
CROSS Safety Report
Report ID: 343
Region: CROSS-UK
Repeating the same design mistakes
A correspondent who investigates engineering failures has shared common errors which engineers keep repeating.
1 October 2019
CROSS Safety Report
Report ID: 858
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.