- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK [sub-heading only] (19)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (10)
- CROSS Safety Alert (2)
- CROSS Safety Report (31)
- CROSS Topic Paper (2)
- News [sub-heading only] (3)
CROSS regions
Further issues with freezing and galvanised hollow sections
A reporter was involved in correcting a cold formed galvanised square hollow section (SHS) four storey balcony structure where longitudinal splits formed in at least two of the four columns.
1 January 2014
CROSS Safety Report
Report ID: 314
Region: CROSS-UK
Telecommunications towers and resin anchors
A correspondent shares their concerns following the collapse of a telecommunications tower.
1 April 2013
CROSS Safety Report
Report ID: 315
Region: CROSS-UK
Concern about foundations to telecoms masts
Concerns are raised about a potential safety problem with the design and construction of ‘root’ foundations for telecom poles.
1 January 2018
CROSS Safety Report
Report ID: 690
Region: CROSS-UK
Fibrous plaster ceiling features
This recent report of a serious concern about an old fibrous plaster ceiling has similarities to the Apollo Theatre ceiling collapse in London in December 2013.
1 July 2015
CROSS Safety Report
Report ID: 518
Region: CROSS-UK
Lack of lateral stability in steel frame
Concerns were raised after the steel frame of a building was found to have a lack of horizontal and vertical bracing.
1 July 2016
CROSS Safety Report
Report ID: 540
Region: CROSS-UK
Metal panel blown off roof
During some exceptionally gusty winds, a metal roof panel was blown off an office building roof onto a railway station roof below.
1 April 2016
CROSS Safety Report
Report ID: 537
Region: CROSS-UK
Glass panel blown out by wind in city centre
A U shaped glass panel was blown out of a fourth floor stair enclosure by high winds and fell to the ground.
1 April 2016
CROSS Safety Report
Report ID: 535
Region: CROSS-UK
High mast light poles removed from UK site
Five high mast light poles (HMLPs) were removed from a public site as it was considered that there was a possibility of collapse.
1 January 2017
CROSS Safety Report
Report ID: 610
Region: CROSS-UK
Cantilever signal base failure - holding down bolts in bending
A railway asset owner noticed that a 9m cantilever signal structure was sagging alarmingly and stopped trains on the line to investigate the matter.
1 October 2017
CROSS Safety Report
Report ID: 627
Region: CROSS-UK
Plasterwork ceiling partial collapse at railway station
A section of a ceiling cornice, plasterboard panel and lighting collapsed at a railway station landing on the floor.
1 October 2016
CROSS Safety Report
Report ID: 587
Region: CROSS-UK