Safety information search results
Filter your results
Building or structure type
- Bridges (24)
- Buildings
(205)
- Commercial (16)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (10)
- Health care (2)
- Industrial buildings (3)
- LPS buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (54)
- Stadiums (3)
- Storage buildings (3)
- Tall buildings (6)
- Theatres & other entertainment buildings (6)
- Transport buildings (2)
- Buried pipes & culverts (3)
- Car parks (6)
- Flats & apartments (14)
- Hotels & hostels (1)
- Houses (27)
- Masts & towers (12)
- Railways (7)
- Reservoirs & dams (1)
- Retaining structures (19)
- Roads (6)
- Sewers (3)
- Temporary structures (24)
- Tunnels (2)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (1)
- Design: quality management (21)
- Design calculations (22)
- Design conceptualisation (8)
- Design detailing (56)
- Design drawings (21)
- Design loads (41)
- Design software (6)
- Dynamics (4)
- Fire safety design (7)
- Resilience (5)
- Robustness (20)
- Structural design (50)
- Sustainability (1)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (20)
- Assessment project [sub-heading only] (2)
- Construction project [sub-heading only] (155)
- Demolition project (9)
- Excavation (15)
- Extension project (7)
- Groundworks project (3)
- Maintenance project (2)
- New build (84)
- Refurbishment (7)
- Remediation project (6)
- Strengthening project (3)
- Structural assessment (2)
- Underpinning project (3)
Construction period
Elements & systems
- Arch (1)
- Balconies (6)
- Balustrades (7)
- Basements (7)
- Beams (50)
- Bracing (12)
- Cables (2)
- Canopies (1)
- Ceilings (17)
- Cladding (21)
- Columns (25)
- Fasteners & connections (108)
- Fire protection (5)
- Foundations (29)
- Insulation (2)
- Light gauge steel framing (6)
- Lintels (2)
- Padstones (5)
- Parapets (5)
- PV panels (2)
- Roofs (26)
- Shear walls (2)
- Signs (3)
- Slabs (29)
- Tendons (1)
- Trusses (5)
- Wall head restraints (3)
- Walls (65)
- Wall ties (9)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (4)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 4 (3)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS [sub-heading only] (11)
- CROSS-UK Newsletter 1 (7)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (6)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (6)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (4)
- CROSS-UK Newsletter 9 (4)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (4)
- CROSS-UK Newsletter 12 (4)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (4)
- CROSS-UK Newsletter 15 (3)
- CROSS-UK Newsletter 16 (3)
- CROSS-UK Newsletter 17 (4)
- CROSS-UK Newsletter 18 (4)
- CROSS-UK Newsletter 19 (5)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (4)
- CROSS-UK Newsletter 27 (2)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (4)
- CROSS-UK Newsletter 32 (5)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 34 (6)
- CROSS-UK Newsletter 35 (7)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (4)
- CROSS-UK Newsletter 38 (5)
- CROSS-UK Newsletter 39 (4)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (4)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (6)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (6)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (5)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (5)
- CROSS-UK Newsletter 59 (5)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (2)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (218)
- CROSS-US Newsletter 1 (5)
- CROSS-US Newsletter 2 (4)
- CROSS-US Newsletter 3 (3)
- CROSS-US [sub-heading only] (9)
- CROSS Newsletter (118)
- CROSS Safety Alert (11)
- CROSS Safety Report (339)
- CROSS Topic Paper (8)
- News [sub-heading only] (40)
- Safety information from CROSS [sub-heading only] (2)
- Safety information [sub-heading only] (1)
CROSS regions
Deficiencies on access scaffold
Investigation by a reporter’s firm into an access scaffold on a refurbishment contract on a city centre site brought to light a number of deficiencies which rendered the scaffold out with its design parameters.
1 April 2011
CROSS Safety Report
Report ID: 219
Region: CROSS-UK
Risk in notching timber studs
During the construction of a block of apartments a reporter found a couple of locations on an external fourth floor wall where the load-bearing studs had been notched well past permissible depths.
1 January 2011
CROSS Safety Report
Report ID: 209
Region: CROSS-UK
Permanent formwork to slabs
Concerns are raised over deflection issues that are not being considered when using permanent formwork.
1 January 2011
CROSS Safety Report
Report ID: 215
Region: CROSS-UK
Need for licensed builders
A reporter feels certain building work should only be carried out by licensed qualified builders.
1 January 2011
CROSS Safety Report
Report ID: 214
Region: CROSS-UK
Verification of inspection documents
A reporter raises concern after evidence had recently been received that an increased number of ‘copies’ of the supplier’s inspection certificates for heavy plate products had been modified from the original state or falsified.
1 April 2011
CROSS Safety Report
Report ID: 226
Region: CROSS-UK
Stability compromised in school hall
A reporter highlights construction issues that occurred during the construction of a new school hall.
1 January 2012
CROSS Safety Report
Report ID: 242
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Defective imported scaffold ties
On a contract where multi lift access scaffolds had been installed for a period of up to 18 months in an exposed coastal location, it was found by a reporter on one of the regular inspections that some of the scaffold ties had failed.
1 April 2011
CROSS Safety Report
Report ID: 230
Region: CROSS-UK
Failed two storey retaining wall
A two storey high retaining wall adjacent to a house collapsed.
1 October 2011
CROSS Safety Report
Report ID: 240
Region: CROSS-UK
Lack of control on site when underpinning
The concern is in relation to the sequencing of construction and the lack of control on site from competent persons during underpinning works.
1 October 2011
CROSS Safety Report
Report ID: 241
Region: CROSS-UK