Safety information search results
Filter your results
Building or structure type
- Bridges (24)
- Buildings
(205)
- Commercial (16)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (10)
- Health care (2)
- Industrial buildings (3)
- LPS buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (54)
- Stadiums (3)
- Storage buildings (3)
- Tall buildings (6)
- Theatres & other entertainment buildings (6)
- Transport buildings (2)
- Buried pipes & culverts (3)
- Car parks (6)
- Flats & apartments (14)
- Hotels & hostels (1)
- Houses (27)
- Masts & towers (12)
- Railways (7)
- Reservoirs & dams (1)
- Retaining structures (19)
- Roads (6)
- Sewers (3)
- Temporary structures (24)
- Tunnels (2)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (1)
- Design: quality management (21)
- Design calculations (22)
- Design conceptualisation (8)
- Design detailing (56)
- Design drawings (21)
- Design loads (41)
- Design software (6)
- Dynamics (4)
- Fire safety design (7)
- Resilience (5)
- Robustness (20)
- Structural design (50)
- Sustainability (1)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (20)
- Assessment project [sub-heading only] (2)
- Construction project [sub-heading only] (155)
- Demolition project (9)
- Excavation (15)
- Extension project (7)
- Groundworks project (3)
- Maintenance project (2)
- New build (84)
- Refurbishment (7)
- Remediation project (6)
- Strengthening project (3)
- Structural assessment (2)
- Underpinning project (3)
Construction period
Elements & systems
- Arch (1)
- Balconies (6)
- Balustrades (7)
- Basements (7)
- Beams (50)
- Bracing (12)
- Cables (2)
- Canopies (1)
- Ceilings (17)
- Cladding (21)
- Columns (25)
- Fasteners & connections (108)
- Fire protection (5)
- Foundations (29)
- Insulation (2)
- Light gauge steel framing (6)
- Lintels (2)
- Padstones (5)
- Parapets (5)
- PV panels (2)
- Roofs (26)
- Shear walls (2)
- Signs (3)
- Slabs (29)
- Tendons (1)
- Trusses (5)
- Wall head restraints (3)
- Walls (65)
- Wall ties (9)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (4)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 4 (3)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS [sub-heading only] (11)
- CROSS-UK Newsletter 1 (7)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (6)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (6)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (4)
- CROSS-UK Newsletter 9 (4)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (4)
- CROSS-UK Newsletter 12 (4)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (4)
- CROSS-UK Newsletter 15 (3)
- CROSS-UK Newsletter 16 (3)
- CROSS-UK Newsletter 17 (4)
- CROSS-UK Newsletter 18 (4)
- CROSS-UK Newsletter 19 (5)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (4)
- CROSS-UK Newsletter 27 (2)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (4)
- CROSS-UK Newsletter 32 (5)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 34 (6)
- CROSS-UK Newsletter 35 (7)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (4)
- CROSS-UK Newsletter 38 (5)
- CROSS-UK Newsletter 39 (4)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (4)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (6)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (6)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (5)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (5)
- CROSS-UK Newsletter 59 (5)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (2)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (218)
- CROSS-US Newsletter 1 (5)
- CROSS-US Newsletter 2 (4)
- CROSS-US Newsletter 3 (3)
- CROSS-US [sub-heading only] (9)
- CROSS Newsletter (118)
- CROSS Safety Alert (11)
- CROSS Safety Report (339)
- CROSS Topic Paper (8)
- News [sub-heading only] (40)
- Safety information from CROSS [sub-heading only] (2)
- Safety information [sub-heading only] (1)
CROSS regions
Changes in temporary works scheme
Changes in the construction programme on site led to the construction of the superstructure of a building, without the liner wall below it being completed.
1 April 2017
CROSS Safety Report
Report ID: 603
Region: CROSS-UK
Wind damage to roof with PV panels
A reporter describes how during a heavy storm a big area of roof tiles that were adjacent to PV panels blew down.
1 October 2016
CROSS Safety Report
Report ID: 590
Region: CROSS-UK
Lighting pole strikes live overhead cable
An excavator operator accidentally struck a live overhead cable during the installation of a lighting pole.
1 April 2017
CROSS Safety Report
Report ID: 605
Region: CROSS-UK
Settlement of driven piles
A railway platform was constructed on piled foundations and it was noticed that one pair of piles and their associated cross head settled soon afterwards.
1 April 2017
CROSS Safety Report
Report ID: 607
Region: CROSS-UK
Multi-storey car park foundations
Concerns are raised about the integrity of a completed car park structure following poor quality control procedures during construction.
1 October 2017
CROSS Safety Report
Report ID: 630
Region: CROSS-UK
Partial failure of precast concrete tank unit on installation
Concerns are raised after the foot of a precast concrete unit failed during installation, making the unit unstable.
1 April 2017
CROSS Safety Report
Report ID: 626
Region: CROSS-UK
Worker trapped in excavation
An operative received serious injuries when the excavation they were working in collapsed.
1 July 2016
CROSS Safety Report
Report ID: 576
Region: CROSS-UK
Undermined bridge wing wall collapses
A masonry wing wall of a bridge collapsed and fell as a single section coming to rest against an adjacent pile after being undermined on site.
1 April 2016
CROSS Safety Report
Report ID: 577
Region: CROSS-UK
Plasterwork ceiling partial collapse at railway station
A section of a ceiling cornice, plasterboard panel and lighting collapsed at a railway station landing on the floor.
1 October 2016
CROSS Safety Report
Report ID: 587
Region: CROSS-UK
Embankment slip during excavation works
Concerns were raised and strengthening works required after vertical movement was observed on the safety critical surface at the top of an 8m high embankment.
1 October 2016
CROSS Safety Report
Report ID: 572
Region: CROSS-UK