Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK [sub-heading only] (5)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (4)
- (-) CROSS Safety Report (8)
- News [sub-heading only] (2)
CROSS regions
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Timber truss
The reporter has been dealing with an application where the engineer involved discovered proprietary timber girder trusses with some glued joints that have come loose.
1 February 2007
CROSS Safety Report
Report ID: 62
Region: CROSS-UK
Timber roof truss bracing problem
Lateral movement of the roof tiles on a two-storey mid-terrace house built approximately 35 years ago with a trussed rafter roof led to the discovery of broken bracing.
1 July 2014
CROSS Safety Report
Report ID: 354
Region: CROSS-UK
Roof constructed without structural input
A reporter wants to highlight the problem of builders working off plans provided by an architect or surveyor and assuming that section sizes shown on their drawings are structurally adequate.
1 January 2016
CROSS Safety Report
Report ID: 515
Region: CROSS-UK
Failure of existing long-span wood roof truss following installation of new roof-top HVAC units
Failure of an existing long-span wood roof truss following installation of new roof-top Heating, Ventilating, and Air Conditioning (HVAC) units offers lessons in the special challenges of renovations to existing buildings.
1 September 2020
CROSS Safety Report
Report ID: 949
Region: CROSS-US
Bottom-chord bracing for metal plate-connected wood trusses used in light-commercial applications
Concerns regarding metal plate-connected wood trusses in light-commercial construction when subject to net uplift.
1 September 2020
CROSS Safety Report
Report ID: 985
Region: CROSS-US
Lack of lateral stability in steel frame
Concerns were raised after the steel frame of a building was found to have a lack of horizontal and vertical bracing.
1 July 2016
CROSS Safety Report
Report ID: 540
Region: CROSS-UK
Wind damage to roof with PV panels
A reporter describes how during a heavy storm a big area of roof tiles that were adjacent to PV panels blew down.
1 October 2016
CROSS Safety Report
Report ID: 590
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.