Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- (-) CROSS-UK [sub-heading only] (16)
- CROSS Newsletter (10)
- CROSS Safety Report (16)
- News [sub-heading only] (2)
CROSS regions
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Inadequate foundation reinforcement
Subcontractors carrying out the ground works for a multi-storey development failed to provide sufficient continuity reinforcement in the ground beams.
1 October 2008
CROSS Safety Report
Report ID: 112
Region: CROSS-UK
Collapse of tank falsework
This report relates to the collapse of falsework erected to construct an in situ, reinforced concrete, circular water retaining structure.
1 October 2009
CROSS Safety Report
Report ID: 150
Region: CROSS-UK
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK
Split responsibilities on temporary bracing of steelwork
A contractor removed temporary bracing on site prior to the structure being in a permanent stable state.
1 July 2010
CROSS Safety Report
Report ID: 204
Region: CROSS-UK
GRP panels as permanent shuttering
A reporter highlights problems that were encountered when Glassfibre Reinforced Plastic (GRP) panels were used as permanent formwork on a highway construction project.
1 October 2012
CROSS Safety Report
Report ID: 342
Region: CROSS-UK
Quality of design and construction of a major bridge structure
This report concerns the design and installation of the bridge bearing zones on a new prestressed precast concrete viaduct.
1 October 2018
CROSS Safety Report
Report ID: 781
Region: CROSS-UK
Issues with imported steel
Defective steel, says a reporter, was found in a major retail store where the material had been imported from a supplier overseas.
1 October 2014
CROSS Safety Report
Report ID: 474
Region: CROSS-UK
Failure of precast concrete cover slab to circular shaft
A reporter describes how several precast concrete cover slab units collapsed shortly after being installed.
1 April 2015
CROSS Safety Report
Report ID: 505
Region: CROSS-UK
Dangerous substitution of lintels on domestic projects
This report highlights the structural risk of substituting lintels during domestic projects without approval from the design engineer.
1 April 2020
CROSS Safety Report
Report ID: 889
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.