Safety information search results
Filter your results
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (17)
- CROSS Newsletter (13)
- CROSS Safety Report (25)
- News [sub-heading only] (4)
CROSS regions
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Critical welding of structural steelwork missed
The designer of a steelwork roof frame found a critical fabrication error when inspecting steelwork on site before it was erected.
21 November 2022
CROSS Safety Report
Report ID: 1126
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Cladding failure in strong winds
A reporter writes with concerns about a repeat failure of building cladding, in severe but not exceptional winds, that saw panels fall to the public street below.
17 February 2023
CROSS Safety Report
Report ID: 1172
Region: CROSS-UK
Incorrectly fixed sheets blow off parapet
This report concerns aluminium coping sheets that blew off the parapet of a block of flats under construction. The reporter says a fierce wind blew off several sheets which fell to the ground about 9m below. A building and a car were damaged but thankfully no one was hurt, although the potential for personal injury or death was significant.
25 May 2023
CROSS Safety Report
Report ID: 1180
Region: CROSS-UK
Ceiling collapse in an educational building
A suspended ceiling in a large teaching hall collapsed days before the official opening of a new educational building.
1 April 2008
CROSS Safety Report
Report ID: 100
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.