Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK [sub-heading only] (12)
- CROSS Newsletter (5)
- CROSS Safety Report (16)
- News [sub-heading only] (1)
CROSS regions
Failure of blind bolts
There was a partial collapse of a steel frame building due to the failure of some blind bolts during the construction period. Loads at the time were well below anticipated failure levels.
1 April 2007
CROSS Safety Report
Report ID: 71
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Demolition risks
This report is about the collapse of a flat slab building that occurred overseas whilst the top floor of the building was being demolished onto the next floor down.
1 January 2008
CROSS Safety Report
Report ID: 96
Region: CROSS-UK
Ceiling collapse in an educational building
A suspended ceiling in a large teaching hall collapsed days before the official opening of a new educational building.
1 April 2008
CROSS Safety Report
Report ID: 100
Region: CROSS-UK
Serious injury from free standing wall collapse
A 100mm wide brick masonry wall in a garden collapsed seriously injuring one person.
1 January 2008
CROSS Safety Report
Report ID: 94
Region: CROSS-UK
Modifications to balustrades in a shopping centre
A reporter raises concerns about balustrades on a balcony at an existing shopping centre which they feel may not be adequate for their purpose.
1 July 2013
CROSS Safety Report
Report ID: 336
Region: CROSS-UK
Example of small temporary stage structure
This is an example of a small stage that is potentially unstable.
1 January 2013
CROSS Safety Report
Report ID: 302
Region: CROSS-UK
Masonry fall due to high wind
A five block high masonry wall collapsed during high winds.
1 January 2012
CROSS Safety Report
Report ID: 295
Region: CROSS-UK
Lack of control on site when underpinning
The concern is in relation to the sequencing of construction and the lack of control on site from competent persons during underpinning works.
1 October 2011
CROSS Safety Report
Report ID: 241
Region: CROSS-UK
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.