Safety information search results
Filter your results
Products
Project or lifecycle stage
Operation or occupation
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Content type
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK [sub-heading only] (10)
- CROSS-US Newsletter 2 (2)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (7)
- CROSS Safety Report (22)
- News [sub-heading only] (4)
CROSS regions
Failure of pile load test arrangement
A pile was being load-tested, for confirmation of design pile loads for the foundations of a road bridge, when the web of the deep steel beam used in the testing arrangement buckled.
1 January 2015
CROSS Safety Report
Report ID: 484
Region: CROSS-UK
High mast light poles removed from UK site
Five high mast light poles (HMLPs) were removed from a public site as it was considered that there was a possibility of collapse.
1 January 2017
CROSS Safety Report
Report ID: 610
Region: CROSS-UK
Concerns over unreinforced lighting column foundation
Concerns were raised on a major highway project after it was noticed that the contractor was casting a pad foundation with no reinforcement in the base.
1 July 2017
CROSS Safety Report
Report ID: 652
Region: CROSS-UK
Concern about foundations to telecoms masts
Concerns are raised about a potential safety problem with the design and construction of ‘root’ foundations for telecom poles.
1 January 2018
CROSS Safety Report
Report ID: 690
Region: CROSS-UK
Failure of tower crane studs
This report describes how non-standard Grade 10.9 studs used to connect a tower crane mast to a steel grillage failed.
1 January 2017
CROSS Safety Report
Report ID: 600
Region: CROSS-UK
Sudden hole in piling mat - update
This is further information about report 566 which highlighted how a sudden hole appeared in a piling mat.
1 October 2016
CROSS Safety Report
Report ID: 596
Region: CROSS-UK
Cantilever signal base failure - holding down bolts in bending
A railway asset owner noticed that a 9m cantilever signal structure was sagging alarmingly and stopped trains on the line to investigate the matter.
1 October 2017
CROSS Safety Report
Report ID: 627
Region: CROSS-UK
Multi-storey car park foundations
Concerns are raised about the integrity of a completed car park structure following poor quality control procedures during construction.
1 October 2017
CROSS Safety Report
Report ID: 630
Region: CROSS-UK
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK
Mandatory seismic retrofit construction with quality control problems
Standard seismic retrofit details were used for a building with a non-standard foundation, resulting in inadequate connection of structural shear walls to foundations.
1 September 2020
CROSS Safety Report
Report ID: 888
Region: CROSS-US