Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Fire compartmentation detailing issues
Two reports have been received concerning fire compartmentation detailing issues; one on the incorrect installation of fire batts and the other on the incorrect use of intumescent material.
18 August 2021
CROSS Safety Report
Report ID: 1039
Region: CROSS-UK
Collapse of a wall during construction
An internal corridor wall collapsed in a school under construction.
1 April 2008
CROSS Safety Report
Report ID: 99
Region: CROSS-UK
Stability compromised in school hall
A reporter highlights construction issues that occurred during the construction of a new school hall.
1 January 2012
CROSS Safety Report
Report ID: 242
Region: CROSS-UK
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK
Changes in temporary works scheme
Changes in the construction programme on site led to the construction of the superstructure of a building, without the liner wall below it being completed.
1 April 2017
CROSS Safety Report
Report ID: 603
Region: CROSS-UK
Unauthorised alterations to Light Gauge Steel Framing on site
Concerns were raised after Light Gauge Steel Framing (LGSF) acting as a structural system was trimmed locally on site to accommodate the installation of balcony brackets without approval from the design team.
1 July 2018
CROSS Safety Report
Report ID: 669
Region: CROSS-UK
Shutter failure during concrete wall pour
A reporter describes how a shutter failed during a concrete wall pour due to resin fixed ties not being allowed to cure.
1 April 2019
CROSS Safety Report
Report ID: 766
Region: CROSS-UK