Safety information search results
Filter your results
Project or lifecycle stage
Operation or occupation
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (16)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (12)
- CROSS Safety Report (24)
- News [sub-heading only] (2)
CROSS regions
Roof collapse of warehouse structure under rainwater ponding
This report highlights the structural risk caused by rainwater ponding on relatively flat roofs.
10 May 2021
CROSS Safety Report
Report ID: 969
Region: CROSS-US
The use of cast-in ferrules as structural connections
This report highlights several problems that can arise with structural connections between elements when cast-in ferrules (also known as threaded inserts) are used for the anchorage of reinforcing bars.
30 April 2021
CROSS Safety Report
Report ID: 993
Region: CROSS-AUS
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Inadequate foundation reinforcement
Subcontractors carrying out the ground works for a multi-storey development failed to provide sufficient continuity reinforcement in the ground beams.
1 October 2008
CROSS Safety Report
Report ID: 112
Region: CROSS-UK
Collapse of tank falsework
This report relates to the collapse of falsework erected to construct an in situ, reinforced concrete, circular water retaining structure.
1 October 2009
CROSS Safety Report
Report ID: 150
Region: CROSS-UK
Stability compromised in school hall
A reporter highlights construction issues that occurred during the construction of a new school hall.
1 January 2012
CROSS Safety Report
Report ID: 242
Region: CROSS-UK
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK
Split responsibilities on temporary bracing of steelwork
A contractor removed temporary bracing on site prior to the structure being in a permanent stable state.
1 July 2010
CROSS Safety Report
Report ID: 204
Region: CROSS-UK
GRP panels as permanent shuttering
A reporter highlights problems that were encountered when Glassfibre Reinforced Plastic (GRP) panels were used as permanent formwork on a highway construction project.
1 October 2012
CROSS Safety Report
Report ID: 342
Region: CROSS-UK
Quality of design and construction of a major bridge structure
This report concerns the design and installation of the bridge bearing zones on a new prestressed precast concrete viaduct.
1 October 2018
CROSS Safety Report
Report ID: 781
Region: CROSS-UK